A Robust, Resilience Machine Learning With a Risk Approach for Project Scheduling

ABSTRACT This study proposes a novel Robust, Resilient, and Risk‐Based approach in Machine Learning (3RML) that emphasizes the application of project scheduling for the first time. A robust stochastic LASSO regression model is proposed to predict project duration. This model seeks to enhance a traditional LASSO regression by minimizing the expected value and the Weighted Value at Risk (WVaR) of the Mean Absolute Deviation (MAD) while penalizing the regression coefficients. The 3R requirements, which prioritize robustness, resilience, and risk aversion, are integrated into the mathematical model to ensure flexibility and disaster consideration. A comparative analysis was carried out between the square root, logarithm, and mixed linear/square root models and the baseline model. The Robust, Resilience MAD with Risk‐Averse (RRMADR) and R ‐squared values were computed. The square root regression model demonstrated a 36% enhancement compared with the primary model. The conservatism coefficient affects risk levels, where a 5% increase results in a 2% decrease in the RRMADR. Varying confidence levels influence the model. The penalty coefficient in the lasso regression affects RRMADR and R ‐squared. The resiliency coefficient impacts both the RRMADR and R ‐squared. Probability scenarios influence RRMADR but do not affect R ‐squared. The type of probability density influences the RRMADR but does not impact R ‐squared.

Authors

Institutions

Publication Details

Journal
Engineering Reports
Published
2025-05-29
DOI
https://doi.org/10.1002/eng2.70161
Citations
2
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
2.80
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Robust, Resilience Machine Learning With a Risk Approach for Project Scheduling

Ehsan Ghafourian, Reza Lotfi, Ebrahim Farbod, Sadia Samar Ali et al.
2 citations
Engineering Reports
Risk and Safety Analysis
2.80
article

A Robust, Resilience Machine Learning With a Risk Approach for Project Scheduling

Ehsan Ghafourian, Reza Lotfi, Ebrahim Farbod, Sadia Samar Ali, Fatemeh Ramyar, Soheila Sadeghi
article en
2 citations

Abstract

ABSTRACT This study proposes a novel Robust, Resilient, and Risk‐Based approach in Machine Learning (3RML) that emphasizes the application of project scheduling for the first time. A robust stochastic LASSO regression model is proposed to predict project duration. This model seeks to enhance a traditional LASSO regression by minimizing the expected value and the Weighted Value at Risk (WVaR) of the Mean Absolute Deviation (MAD) while penalizing the regression coefficients. The 3R requirements, which prioritize robustness, resilience, and risk aversion, are integrated into the mathematical model to ensure flexibility and disaster consideration. A comparative analysis was carried out between the square root, logarithm, and mixed linear/square root models and the baseline model. The Robust, Resilience MAD with Risk‐Averse (RRMADR) and R ‐squared values were computed. The square root regression model demonstrated a 36% enhancement compared with the primary model. The conservatism coefficient affects risk levels, where a 5% increase results in a 2% decrease in the RRMADR. Varying confidence levels influence the model. The penalty coefficient in the lasso regression affects RRMADR and R ‐squared. The resiliency coefficient impacts both the RRMADR and R ‐squared. Probability scenarios influence RRMADR but do not affect R ‐squared. The type of probability density influences the RRMADR but does not impact R ‐squared.

Engineering ReportsVol. 7(6)
Yazd University (IR), International Management Institute (IN), Iowa State University (US), King Abdulaziz University (SA), University of the Incarnate Word (US), Payame Noor University (IR), Auburn University (US)
Openalex Percentile: Top 8%
Risk and Safety Analysis
2.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Robust, Resilience Machine Learning With a Risk Approach for Project Scheduling — Ehsan Ghafourian, Reza Lotfi, et al. · Engineering Reports (2025) | TGRS Research Map | TGRS