Milwaukee Metropolitan Sewerage District (MMSD) has initiated the Milwaukee Estuary Dredged Material Management Facility (DMMF) project to provide disposal capacity for 1.9 million cu yd (1.4 million m3) of contaminated spoils to be dredged from the Milwaukee, Menomonee, and Kinnickinnic Rivers and Milwaukee Bay. Though DMMFs typically use earthen dikes for material containment, Milwaukee DMMF uses tandem combi-wall structures on the waterside perimeter instead. It is the second such facility to be constructed in the Great Lakes. Ensuring the stability of the containment necessitated innovative practices for analyzing tandem bulkhead structures, where parallel rows of sheet piling form a relatively narrow containment for earth fill between, with significant structure-soil-structure interaction between the two walls. Despite this increasingly common wall configuration, there is limited technical literature available. Consequentially, the design team used finite element techniques to analyze this structure. This paper discusses the planning, design, and sequence of construction for the tandem combi-wall containment structures.

Authors

Publication Details

Published
2025-05-29
DOI
https://doi.org/10.1061/9780784486146.050
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Milwaukee DMMF—Tandem Sheet Pile Containment, Design, and Construction

Michael S. Winters, Brian Shaw
Geotechnical Engineering and Soil Stabilization
article

Milwaukee DMMF—Tandem Sheet Pile Containment, Design, and Construction

Michael S. Winters, Brian Shaw
article en

Abstract

Milwaukee Metropolitan Sewerage District (MMSD) has initiated the Milwaukee Estuary Dredged Material Management Facility (DMMF) project to provide disposal capacity for 1.9 million cu yd (1.4 million m3) of contaminated spoils to be dredged from the Milwaukee, Menomonee, and Kinnickinnic Rivers and Milwaukee Bay. Though DMMFs typically use earthen dikes for material containment, Milwaukee DMMF uses tandem combi-wall structures on the waterside perimeter instead. It is the second such facility to be constructed in the Great Lakes. Ensuring the stability of the containment necessitated innovative practices for analyzing tandem bulkhead structures, where parallel rows of sheet piling form a relatively narrow containment for earth fill between, with significant structure-soil-structure interaction between the two walls. Despite this increasingly common wall configuration, there is limited technical literature available. Consequentially, the design team used finite element techniques to analyze this structure. This paper discusses the planning, design, and sequence of construction for the tandem combi-wall containment structures.

Sustainable cities and communities
Openalex Percentile: Top 88%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.