Guide for a Risk-Based Approach to Environmental Windows for Dredging and Navigation Infrastructure

PIANC EnviCom Working Group 227 is developing a decision-making guide associated with the application of environmental windows for dredging and marine navigation infrastructure construction. Dredging and construction works are often restricted during certain periods to reduce potential impacts on environmental receptors. Times when the potential environmental impacts of the project are thought or perceived to be unacceptable—and, consequently, works are not allowed—are commonly defined as seasonal restrictions. Conversely, environmental windows are the periods when works are allowed. Limiting projects to fixed environmental windows complicates contracting schedules by constricting them, adds challenges with respect to the availability of construction equipment, and extends project timelines. These limitations can also impact the safety of works and inflate their cost. The objective of this guide is to provide a risk-based decision-making process that can be applied in cases where restrictions on dredging and navigation infrastructure work may be considered. Case studies are included.

Authors

Publication Details

Published
2025-05-29
DOI
https://doi.org/10.1061/9780784486146.041
Primary Topic
Environmental and Sediment Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Guide for a Risk-Based Approach to Environmental Windows for Dredging and Navigation Infrastructure

Rebecca Desrosiers, Gerard van Raalte, Joshua van Berkel, David Petch
Environmental and Sediment Control
article

Guide for a Risk-Based Approach to Environmental Windows for Dredging and Navigation Infrastructure

Rebecca Desrosiers, Gerard van Raalte, Joshua van Berkel, David Petch
article en

Abstract

PIANC EnviCom Working Group 227 is developing a decision-making guide associated with the application of environmental windows for dredging and marine navigation infrastructure construction. Dredging and construction works are often restricted during certain periods to reduce potential impacts on environmental receptors. Times when the potential environmental impacts of the project are thought or perceived to be unacceptable—and, consequently, works are not allowed—are commonly defined as seasonal restrictions. Conversely, environmental windows are the periods when works are allowed. Limiting projects to fixed environmental windows complicates contracting schedules by constricting them, adds challenges with respect to the availability of construction equipment, and extends project timelines. These limitations can also impact the safety of works and inflate their cost. The objective of this guide is to provide a risk-based decision-making process that can be applied in cases where restrictions on dredging and navigation infrastructure work may be considered. Case studies are included.

Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Environmental and Sediment Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Guide for a Risk-Based Approach to Environmental Windows for Dredging and Navigation Infrastructure — Rebecca Desrosiers, Gerard van Raalte, et al. · (2025) | TGRS Research Map | TGRS