Soil-Cement Ground Improvement Design: Port of Vancouver USA Terminal 1 Dock Improvements

This paper presents the geotechnical design and analysis for the replacement of the Terminal 1 dock structure at the Port of Vancouver USA. The new structure will support a public marketplace and improve access to the Columbia River. The project involves the installation of a combi-wall bulkhead and upland ground improvements aimed at reducing liquefaction-induced lateral spreading and kinematic loading on the dock piles, along with regrading the over-steepened slope on the river side of the bulkhead. Site investigations revealed a complex subsurface profile, featuring liquefiable sands and a 25 ft (7.6 m) thick layer of very soft, organic silt within a paleochannel beneath the proposed dock footprint. To mitigate significant lateral deformations, a soil-cement ground improvement buttress was designed using numerical modeling calibrated with site-specific data. This paper details the site characterization, numerical modeling, and innovative ground improvement techniques developed for this challenging project, which is currently under construction in late 2024.

Authors

Institutions

Publication Details

Published
2025-05-29
DOI
https://doi.org/10.1061/9780784486146.018
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Soil-Cement Ground Improvement Design: Port of Vancouver USA Terminal 1 Dock Improvements

Ben Bennetts, Milad Souri, Matt Shanahan
Geotechnical Engineering and Underground Structures
article

Soil-Cement Ground Improvement Design: Port of Vancouver USA Terminal 1 Dock Improvements

Ben Bennetts, Milad Souri, Matt Shanahan
article en

Abstract

This paper presents the geotechnical design and analysis for the replacement of the Terminal 1 dock structure at the Port of Vancouver USA. The new structure will support a public marketplace and improve access to the Columbia River. The project involves the installation of a combi-wall bulkhead and upland ground improvements aimed at reducing liquefaction-induced lateral spreading and kinematic loading on the dock piles, along with regrading the over-steepened slope on the river side of the bulkhead. Site investigations revealed a complex subsurface profile, featuring liquefiable sands and a 25 ft (7.6 m) thick layer of very soft, organic silt within a paleochannel beneath the proposed dock footprint. To mitigate significant lateral deformations, a soil-cement ground improvement buttress was designed using numerical modeling calibrated with site-specific data. This paper details the site characterization, numerical modeling, and innovative ground improvement techniques developed for this challenging project, which is currently under construction in late 2024.

GRi Simulations (Canada) (CA)
Sustainable cities and communities
Openalex Percentile: Top 88%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Soil-Cement Ground Improvement Design: Port of Vancouver USA Terminal 1 Dock Improvements — Ben Bennetts, Milad Souri, et al. · (2025) | TGRS Research Map | TGRS