Placing and Compacting 400,000 cu yd of Fill in the Thames River for the Connecticut State Pier

The State Pier complex in New London, Connecticut, was redeveloped as a purpose-built facility for marshalling heavy cargo, specifically offshore wind turbine components. The facility prior to redevelopment consisted of two adjacent piers with a deepwater berth between them, referred to as “Central Wharf.” The redesign intended to connect the two piers by filling Central Wharf and creating a solid-filled staging area. The infill of Central Wharf needed to be placed and compacted through 35 ft (10.7 m) of water over a thin layer of soft organic silt present at the former mudline. The soft organic soils had to remain in place and could not be mobilized (mud wave) as the fill was placed. The project team developed an innovative, low-cost method to immobilize the organic silt prior to mass filling. The team then developed deep compaction strategies to meet the project specifications. The unique observational approach utilized provided a simple and low-cost solution to challenging site conditions.

Authors

Institutions

Publication Details

Published
2025-05-29
DOI
https://doi.org/10.1061/9780784486146.064
Primary Topic
Materials Engineering and Processing
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Placing and Compacting 400,000 cu yd of Fill in the Thames River for the Connecticut State Pier

David R. Carchedi, Lawrence F. Johnsen, James J. Marsland, Gregory S. DiMillio
Materials Engineering and Processing
article

Placing and Compacting 400,000 cu yd of Fill in the Thames River for the Connecticut State Pier

David R. Carchedi, Lawrence F. Johnsen, James J. Marsland, Gregory S. DiMillio
article en

Abstract

The State Pier complex in New London, Connecticut, was redeveloped as a purpose-built facility for marshalling heavy cargo, specifically offshore wind turbine components. The facility prior to redevelopment consisted of two adjacent piers with a deepwater berth between them, referred to as “Central Wharf.” The redesign intended to connect the two piers by filling Central Wharf and creating a solid-filled staging area. The infill of Central Wharf needed to be placed and compacted through 35 ft (10.7 m) of water over a thin layer of soft organic silt present at the former mudline. The soft organic soils had to remain in place and could not be mobilized (mud wave) as the fill was placed. The project team developed an innovative, low-cost method to immobilize the organic silt prior to mass filling. The team then developed deep compaction strategies to meet the project specifications. The unique observational approach utilized provided a simple and low-cost solution to challenging site conditions.

GZA Ziekenhuizen Campus Sint-Augustinus (BE)
Life below water
Openalex Percentile: Top 89%
Materials Engineering and Processing
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.