Machine Learning–Enhanced Recurrent Event Modeling for Change Order Recurrence in Highway Construction

Change orders are a persistent challenge in construction projects, often resulting in substantial schedule delays and budget overruns. This study examined the recurrence of change orders by analyzing 1,182 change orders across 68 highway construction projects. The objectives of the research were threefold: (1) to identify key factors influencing change order recurrence; (2) to assess how recurrence patterns evolve throughout the project lifecycle; and (3) to evaluate their impact on project outcomes at different stages. A hybrid analytical approach integrating recurrent event modeling and machine learning (ML), along with statistical tests, was utilized to achieve these goals. The findings highlight significant predictors of change order recurrence, including time-dependent factors (e.g., original contract amount), time-independent factors (e.g., change in contract duration), and an ML-derived risk score. This study finds that larger-scale projects, the low-bid-procured design-bid-build delivery method, higher contingency levels, minor contract duration extensions, and Fall-season change orders are linked to increased recurrence, particularly in the early stage of a project. In contrast, as the project progresses, the effects of recurrent change orders on schedules and costs become more pronounced. Based on these insights, this study proposed phase-specific and cross-phase strategies to mitigate the risks associated with recurrent change orders. Through advanced analytical techniques, this research contributes to the body of knowledge in risk management and project planning, offering a robust framework for understanding change order recurrence.

Authors

Institutions

Publication Details

Journal
Journal of Management in Engineering
Published
2025-05-29
DOI
https://doi.org/10.1061/jmenea.meeng-6583
Citations
4
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
8.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Machine Learning–Enhanced Recurrent Event Modeling for Change Order Recurrence in Highway Construction

Daniel D’Angelo, Ali Touran, Jeongyoon Oh, Christopher T. Fisher et al.
4 citations
Journal of Management in Engineering
Construction Project Management and Performance
8.43
article

Machine Learning–Enhanced Recurrent Event Modeling for Change Order Recurrence in Highway Construction

Daniel D’Angelo, Ali Touran, Jeongyoon Oh, Christopher T. Fisher, Baabak Ashuri, Chris Gaskins, Tyler Clark
article en
4 citations

Abstract

Change orders are a persistent challenge in construction projects, often resulting in substantial schedule delays and budget overruns. This study examined the recurrence of change orders by analyzing 1,182 change orders across 68 highway construction projects. The objectives of the research were threefold: (1) to identify key factors influencing change order recurrence; (2) to assess how recurrence patterns evolve throughout the project lifecycle; and (3) to evaluate their impact on project outcomes at different stages. A hybrid analytical approach integrating recurrent event modeling and machine learning (ML), along with statistical tests, was utilized to achieve these goals. The findings highlight significant predictors of change order recurrence, including time-dependent factors (e.g., original contract amount), time-independent factors (e.g., change in contract duration), and an ML-derived risk score. This study finds that larger-scale projects, the low-bid-procured design-bid-build delivery method, higher contingency levels, minor contract duration extensions, and Fall-season change orders are linked to increased recurrence, particularly in the early stage of a project. In contrast, as the project progresses, the effects of recurrent change orders on schedules and costs become more pronounced. Based on these insights, this study proposed phase-specific and cross-phase strategies to mitigate the risks associated with recurrent change orders. Through advanced analytical techniques, this research contributes to the body of knowledge in risk management and project planning, offering a robust framework for understanding change order recurrence.

Journal of Management in EngineeringVol. 41(5)
Georgia Institute of Technology (US), Applied Research Associates (NZ)
Climate action
Openalex Percentile: Top 3%
Construction Project Management and Performance
8.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.