Long-Term Reversible Hydropower System Operation Optimization Based on Fast Unit Commitment

To address the urgent demand for large-scale energy storage in renewable energy transition of China, this study proposes a schematic of reversible hydropower system and its long-term operation optimization model. By employing Fast Unit Commitment (FUC) algorithm, the model effectively reduces computational complexity while maintaining accuracy. Case studies demonstrate that the proposed method takes 1,000 times less time compared to nonlinear programming methods. With cascade reservoirs retrofitted into reversible hydropower stations, wind and solar curtailment rates decrease by 93.83% and 88.72<sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">%</sup>, respectively, leading an annual profit increase of 0.47 billion CNY. These results show the algorithm's efficiency and the retrofit's economic benefit, providing critical insights for enhancing renewable integration in high-penetration grids.

Authors

Institutions

Publication Details

Published
2025-03-21
DOI
https://doi.org/10.1109/sgai64825.2025.11009646
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Long-Term Reversible Hydropower System Operation Optimization Based on Fast Unit Commitment

Xiaowei Yu, Li Chengyuan, Luyu Ma
Power Systems and Renewable Energy
article

Long-Term Reversible Hydropower System Operation Optimization Based on Fast Unit Commitment

Xiaowei Yu, Li Chengyuan, Luyu Ma
article en

Abstract

To address the urgent demand for large-scale energy storage in renewable energy transition of China, this study proposes a schematic of reversible hydropower system and its long-term operation optimization model. By employing Fast Unit Commitment (FUC) algorithm, the model effectively reduces computational complexity while maintaining accuracy. Case studies demonstrate that the proposed method takes 1,000 times less time compared to nonlinear programming methods. With cascade reservoirs retrofitted into reversible hydropower stations, wind and solar curtailment rates decrease by 93.83% and 88.72<sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">%</sup>, respectively, leading an annual profit increase of 0.47 billion CNY. These results show the algorithm's efficiency and the retrofit's economic benefit, providing critical insights for enhancing renewable integration in high-penetration grids.

State Grid Corporation of China (China) (CN), Huazhong University of Science and Technology (CN)
State Grid Corporation of China
Affordable and clean energy
Openalex Percentile: Top 90%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Long-Term Reversible Hydropower System Operation Optimization Based on Fast Unit Commitment — Xiaowei Yu, Li Chengyuan, et al. · (2025) | TGRS Research Map | TGRS