Analysis of Technical Parameters of Small Neutral Reactors for Three Main Transformers in 500kV Jinzhou Substation

In order to cope with the potential risks in the operation of the main transformer of 500 kV Jinzhou Substation, it is planned to install a reactor in the main transformer neutral point. In this paper, using the EMTP (Electro - Magnetic Transients Program) electromagnetic transient simulation program, the over-voltage and insulation coordination are studied by installing a small reactor in the main transformer neutral point in order to determine the technical parameter selection scheme of the main transformer refitted with small reactance equipment and other targeted improvement measures are also proposed, strive to reduce the risk of zero-sequence protection action in the 500 kV Jinzhou Substation's main transformer common winding, improve the opening capacity of zero-sequence voltage for failure protection and effectively limit the short-circuit current level, earnestly ensure the safe, stable and efficient operation of the power system.

Authors

Institutions

Publication Details

Published
2024-12-06
DOI
https://doi.org/10.1109/cespe64643.2024.00030
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Technical Parameters of Small Neutral Reactors for Three Main Transformers in 500kV Jinzhou Substation

Y.T. Dai, Yang Liu, Jing Lv, Jianhui Yang et al.
High-Voltage Power Transmission Systems
article

Analysis of Technical Parameters of Small Neutral Reactors for Three Main Transformers in 500kV Jinzhou Substation

Y.T. Dai, Yang Liu, Jing Lv, Jianhui Yang, Yong Gao
article en

Abstract

In order to cope with the potential risks in the operation of the main transformer of 500 kV Jinzhou Substation, it is planned to install a reactor in the main transformer neutral point. In this paper, using the EMTP (Electro - Magnetic Transients Program) electromagnetic transient simulation program, the over-voltage and insulation coordination are studied by installing a small reactor in the main transformer neutral point in order to determine the technical parameter selection scheme of the main transformer refitted with small reactance equipment and other targeted improvement measures are also proposed, strive to reduce the risk of zero-sequence protection action in the 500 kV Jinzhou Substation's main transformer common winding, improve the opening capacity of zero-sequence voltage for failure protection and effectively limit the short-circuit current level, earnestly ensure the safe, stable and efficient operation of the power system.

Guizhou Electric Power Design and Research Institute (CN)
Affordable and clean energy
Openalex Percentile: Top 72%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines