Research on Improved Genetic Algorithm Based on Multi-Objective Optimization for Flexible Shop Scheduling Problem

This paper addresses the Flexible Job Shop Scheduling Problem (FJSP) in manufacturing by proposing an enhanced genetic algorithm based on multi-objective optimization. As an NP-hard problem, FJSP involves optimizing multiple conflicting objectives, including minimizing makespan, reducing machine load, and improving resource utilization. With the shift toward intelligent systems in manufacturing, efficient workshop scheduling has become crucial for enhancing production efficiency. The proposed algorithm integrates multi-objective optimization techniques to overcome the limitations of traditional methods, maintaining robust global search capabilities to avoid premature convergence and improve convergence speed. By incorporating Pareto multi-objective optimization and an external memory mechanism, the algorithm not only enhances the quality of initial solutions but also increases the survival probability of high-quality individuals during the evolutionary process, significantly improving overall optimization performance. Experimental results demonstrate the algorithm's effectiveness in solving complex FJSP instances.

Authors

Institutions

Publication Details

Published
2025-03-21
DOI
https://doi.org/10.1109/icsi64877.2025.11009833
Citations
1
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Improved Genetic Algorithm Based on Multi-Objective Optimization for Flexible Shop Scheduling Problem

Ke Qin, Ning Liu
1 citations
Advanced Manufacturing and Logistics Optimization
1.24
article

Research on Improved Genetic Algorithm Based on Multi-Objective Optimization for Flexible Shop Scheduling Problem

Ke Qin, Ning Liu
article en
1 citations

Abstract

This paper addresses the Flexible Job Shop Scheduling Problem (FJSP) in manufacturing by proposing an enhanced genetic algorithm based on multi-objective optimization. As an NP-hard problem, FJSP involves optimizing multiple conflicting objectives, including minimizing makespan, reducing machine load, and improving resource utilization. With the shift toward intelligent systems in manufacturing, efficient workshop scheduling has become crucial for enhancing production efficiency. The proposed algorithm integrates multi-objective optimization techniques to overcome the limitations of traditional methods, maintaining robust global search capabilities to avoid premature convergence and improve convergence speed. By incorporating Pareto multi-objective optimization and an external memory mechanism, the algorithm not only enhances the quality of initial solutions but also increases the survival probability of high-quality individuals during the evolutionary process, significantly improving overall optimization performance. Experimental results demonstrate the algorithm's effectiveness in solving complex FJSP instances.

Dezhou University (CN)
Decent work and economic growth
Openalex Percentile: Top 19%
Advanced Manufacturing and Logistics Optimization
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.