Application Construction Heuristic Algorithm for Unrelated Parallel Machines Scheduling with Sequence-and-Machine Dependent Setup Times and Machine Eligibility Restrictions: A Case Study

The textile industry faces increasing demands for quality, faster delivery, and production flexibility. This study proposes a construction heuristic algorithm to optimize the production scheduling of an unrelated parallel machine environment in a knit fabric manufacturing company. The objective is to minimize total tardiness, considering sequence and machine dependent setup times, and machine eligibility. The analysis compares the current problem with the performance of construction heuristics based on dispatching rules including FCFS, SPT, LPT, and EDD rules in Python. The results show that the EDD rule outperforms the others, with only 2 jobs finishing late and total tardiness decreasing from 185.2 to 34.3 hours. The findings of this study demonstrate the effectiveness of the proposed heuristic approach and its potential for actual application in the textile industry.

Authors

Institutions

Publication Details

Published
2024-12-01
DOI
https://doi.org/10.1109/iclie61478.2024.11015377
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application Construction Heuristic Algorithm for Unrelated Parallel Machines Scheduling with Sequence-and-Machine Dependent Setup Times and Machine Eligibility Restrictions: A Case Study

Ngoc-Hien Do, C. Hoa, N.N. Pham Thi, Loc Le Van et al.
Scheduling and Optimization Algorithms
article

Application Construction Heuristic Algorithm for Unrelated Parallel Machines Scheduling with Sequence-and-Machine Dependent Setup Times and Machine Eligibility Restrictions: A Case Study

Ngoc-Hien Do, C. Hoa, N.N. Pham Thi, Loc Le Van, Luan Dang Thi
article en

Abstract

The textile industry faces increasing demands for quality, faster delivery, and production flexibility. This study proposes a construction heuristic algorithm to optimize the production scheduling of an unrelated parallel machine environment in a knit fabric manufacturing company. The objective is to minimize total tardiness, considering sequence and machine dependent setup times, and machine eligibility. The analysis compares the current problem with the performance of construction heuristics based on dispatching rules including FCFS, SPT, LPT, and EDD rules in Python. The results show that the EDD rule outperforms the others, with only 2 jobs finishing late and total tardiness decreasing from 185.2 to 34.3 hours. The findings of this study demonstrate the effectiveness of the proposed heuristic approach and its potential for actual application in the textile industry.

Ho Chi Minh City University of Technology (VN)
Openalex Percentile: Top 56%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.