Real-Time Simulation and Optimization of High-Voltage Cable Construction Process Using Digital Twin and Deep Reinforcement Learning

The construction of high-voltage cable systems involves complex processes that require precise planning, monitoring, and optimization to ensure efficiency and reliability. This study introduces a real-time simulation and optimization framework for the high-voltage cable construction process, leveraging predictive modeling and optimization algorithms. The proposed framework integrates physical and virtual environments to create a dynamic and interactive simulation system. By utilizing real-time data acquisition, advanced predictive models, and optimization techniques, the framework enables continuous monitoring, scenario analysis, and adaptive decision-making during construction. Key challenges such as resource allocation, risk assessment, and schedule optimization are addressed through these computational methods, ensuring improved construction quality and reduced project delays. Experimental results demonstrate the framework's capability to enhance process efficiency, minimize risks, and provide valuable insights for construction management. This work highlights the potential of predictive modeling and optimization algorithms in transforming high-voltage cable construction practices.

Authors

Publication Details

Published
2024-12-06
DOI
https://doi.org/10.1109/cespe64643.2024.00049
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Real-Time Simulation and Optimization of High-Voltage Cable Construction Process Using Digital Twin and Deep Reinforcement Learning

Jia He, Chengbo Wang, Xiaoqing Ren, G. Ye et al.
Industrial Engineering and Technologies
article

Real-Time Simulation and Optimization of High-Voltage Cable Construction Process Using Digital Twin and Deep Reinforcement Learning

Jia He, Chengbo Wang, Xiaoqing Ren, G. Ye, Xinyu Ye
article en

Abstract

The construction of high-voltage cable systems involves complex processes that require precise planning, monitoring, and optimization to ensure efficiency and reliability. This study introduces a real-time simulation and optimization framework for the high-voltage cable construction process, leveraging predictive modeling and optimization algorithms. The proposed framework integrates physical and virtual environments to create a dynamic and interactive simulation system. By utilizing real-time data acquisition, advanced predictive models, and optimization techniques, the framework enables continuous monitoring, scenario analysis, and adaptive decision-making during construction. Key challenges such as resource allocation, risk assessment, and schedule optimization are addressed through these computational methods, ensuring improved construction quality and reduced project delays. Experimental results demonstrate the framework's capability to enhance process efficiency, minimize risks, and provide valuable insights for construction management. This work highlights the potential of predictive modeling and optimization algorithms in transforming high-voltage cable construction practices.

Openalex Percentile: Top 71%
Industrial Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.