Power System Restoration Using Artificial Neural Network (ANN)

The persistent power failure in the country is caused by not restoring power fast for utilization. This leads to introduction of Power system restoration using artificial neural network (ANN). To achieve this, it is carried out in this manner, characterizing power system restoration, establishing the causes of power system failure, designing a SIMULINK model for power system restoration, Training ANN in the causes of power system failure for an effective restoration, develop an algorithm that will implement the process, designing a SIMULINK model for power system restoration using ANN and Validating and justifying the percentage improvement in power system restoration with and without ANN. The results obtained are the conventional short circuit cause of power failure is 54%. On the other hand, when ANN is introduced in the system it reduced to 49.3%. The percentage reduction in power failure as a result of short circuit that increases consistent power supply is 4.7%, with the results obtained, it was ascertained that the conventional overloads that coursed power failure was 72%. Meanwhile, when ANN was imbibed into the system, it decisively reduced it to 65.73% thereby improving constant power supply in the network. it drastically reduced to 65.73%. The percentage improvement in the reduction of power failure that improves power stability is 6.27%, the conventional timeliness in power system restoration is 60% while that when ANN is integrated in the system is 72%. The percentage improvement in power system restoration is 12%, the conventional Prioritization: Utilities in power system restoration is 75%. On the other hand, when ANN is integrated in the system it improves to 90%.The percentage improvement in Prioritization: Utilities in power system restoration over the conventional approach is 15% and the conventional Reliability: Utilities in power system restoration is55%. Meanwhile, when ANN was integrated in the system, it improved to66%. Finally, the percentage improvement in the Reliability: Utilities in power system restoration when ANN is imbibed in the system is 11%.

Authors

Institutions

Publication Details

Journal
American Journal of Multidisciplinary Research and Innovation
Published
2025-05-30
DOI
https://doi.org/10.54536/ajmri.v4i3.4820
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Power System Restoration Using Artificial Neural Network (ANN)

Chukwuagu M. Ifeanyi, Ogbu Gregory, Chukwu Linus
American Journal of Multidisciplinary Research and Innovation
Energy Load and Power Forecasting
article

Power System Restoration Using Artificial Neural Network (ANN)

Chukwuagu M. Ifeanyi, Ogbu Gregory, Chukwu Linus
article en

Abstract

The persistent power failure in the country is caused by not restoring power fast for utilization. This leads to introduction of Power system restoration using artificial neural network (ANN). To achieve this, it is carried out in this manner, characterizing power system restoration, establishing the causes of power system failure, designing a SIMULINK model for power system restoration, Training ANN in the causes of power system failure for an effective restoration, develop an algorithm that will implement the process, designing a SIMULINK model for power system restoration using ANN and Validating and justifying the percentage improvement in power system restoration with and without ANN. The results obtained are the conventional short circuit cause of power failure is 54%. On the other hand, when ANN is introduced in the system it reduced to 49.3%. The percentage reduction in power failure as a result of short circuit that increases consistent power supply is 4.7%, with the results obtained, it was ascertained that the conventional overloads that coursed power failure was 72%. Meanwhile, when ANN was imbibed into the system, it decisively reduced it to 65.73% thereby improving constant power supply in the network. it drastically reduced to 65.73%. The percentage improvement in the reduction of power failure that improves power stability is 6.27%, the conventional timeliness in power system restoration is 60% while that when ANN is integrated in the system is 72%. The percentage improvement in power system restoration is 12%, the conventional Prioritization: Utilities in power system restoration is 75%. On the other hand, when ANN is integrated in the system it improves to 90%.The percentage improvement in Prioritization: Utilities in power system restoration over the conventional approach is 15% and the conventional Reliability: Utilities in power system restoration is55%. Meanwhile, when ANN was integrated in the system, it improved to66%. Finally, the percentage improvement in the Reliability: Utilities in power system restoration when ANN is imbibed in the system is 11%.

American Journal of Multidisciplinary Research and InnovationVol. 4(3)
Enugu State University of Science and Technology (NG), Caritas University (NG)
Openalex Percentile: Top 90%
Energy Load and Power Forecasting
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.