The impact of the reconstruction of the distribution network with intermediate consumption on the reduction of delivered water

This paper analyzes the impact of the reconstruction of the distribution network with incidental consumption in the village of Ljuberađa, Municipality of Babušnica, on the reduction of delivered water volume. The reconstruction was carried out during 2023, but no analysis was conducted during that period; instead, the study focuses solely on the periods before and after the reconstruction. The works included the replacement of pipelines and service connections, and were performed simultaneously with roadworks on the regional road Pirot - Leskovac, section Babušnica - Bonjince. Due to technical limitations on the designated section, it was not possible to precisely determine the ratio of real and apparent losses in the system or to conduct a water loss analysis using the IWA methodology. The analysis instead focuses on changes in the delivered water volume as the reliable indicator of network efficiency improvements.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.5937/gv25091s
Primary Topic
Renewable energy and sustainable power systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The impact of the reconstruction of the distribution network with intermediate consumption on the reduction of delivered water

Mladen Stojanović, Tatjana Ranđelović, Dejan Jordanović
Renewable energy and sustainable power systems
article

The impact of the reconstruction of the distribution network with intermediate consumption on the reduction of delivered water

Mladen Stojanović, Tatjana Ranđelović, Dejan Jordanović
article en

Abstract

This paper analyzes the impact of the reconstruction of the distribution network with incidental consumption in the village of Ljuberađa, Municipality of Babušnica, on the reduction of delivered water volume. The reconstruction was carried out during 2023, but no analysis was conducted during that period; instead, the study focuses solely on the periods before and after the reconstruction. The works included the replacement of pipelines and service connections, and were performed simultaneously with roadworks on the regional road Pirot - Leskovac, section Babušnica - Bonjince. Due to technical limitations on the designated section, it was not possible to precisely determine the ratio of real and apparent losses in the system or to conduct a water loss analysis using the IWA methodology. The analysis instead focuses on changes in the delivered water volume as the reliable indicator of network efficiency improvements.

Openalex Percentile: Top 93%
Renewable energy and sustainable power systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.