Evaluation of construction impacts and optimization of control measures for large-section metro tunnels overpassing existing tunnels

The development of urban rail transit has led to an increase in the number of large section subway tunnels crossing existing tunnels. This study combines the actual engineering of the Yanggongqiao Station Longzhuayan Station section tunnel of Chengdu Metro Line 17 Phase II project crossing the existing Line 7 shield tunnel, and uses on-site investigation, monitoring, and numerical simulation methods to evaluate the construction impact. Based on this, measures such as bench pile reinforcement, pre grouting, and parameter optimization are proposed. In practical applications, the comparison between monitoring and simulation results shows that these measures effectively control the deformation of existing tunnels, providing important references for similar projects.

Authors

Institutions

Publication Details

Journal
Thermal Science
Published
2025-01-01
DOI
https://doi.org/10.2298/tsci2502417c
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of construction impacts and optimization of control measures for large-section metro tunnels overpassing existing tunnels

Jun-Da Wang, Haichun Hao, Shuang You, Yu Zhou et al.
Thermal Science
Geotechnical and Geomechanical Engineering
article

Evaluation of construction impacts and optimization of control measures for large-section metro tunnels overpassing existing tunnels

Jun-Da Wang, Haichun Hao, Shuang You, Yu Zhou, Yiming Chen, W.-C Liao
article en

Abstract

The development of urban rail transit has led to an increase in the number of large section subway tunnels crossing existing tunnels. This study combines the actual engineering of the Yanggongqiao Station Longzhuayan Station section tunnel of Chengdu Metro Line 17 Phase II project crossing the existing Line 7 shield tunnel, and uses on-site investigation, monitoring, and numerical simulation methods to evaluate the construction impact. Based on this, measures such as bench pile reinforcement, pre grouting, and parameter optimization are proposed. In practical applications, the comparison between monitoring and simulation results shows that these measures effectively control the deformation of existing tunnels, providing important references for similar projects.

Thermal ScienceVol. 29(2 Part B)
Shenzhen University (CN), Institute of Disaster Prevention (CN), China Railway Construction Corporation (China) (CN), University of Science and Technology Beijing (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 87%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.