Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects

Authors

Institutions

Publication Details

Journal
Construction Management and Economics
Published
2025-05-28
DOI
https://doi.org/10.1080/01446193.2025.2502461
Citations
1
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects

Gül Polat, David Arditi, Harun Turkoglu
1 citations
Construction Management and Economics
Resource-Constrained Project Scheduling
2.11
article

Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects

Gül Polat, David Arditi, Harun Turkoglu
article en
1 citations

Abstract

No abstract available for this paper.
Construction Management and EconomicsVol. 43(9)
Illinois Institute of Technology (US), Istanbul Technical University (TR)
Industry, innovation and infrastructure
Openalex Percentile: Top 13%
Resource-Constrained Project Scheduling
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects — Gül Polat, David Arditi, et al. · Construction Management and Economics (2025) | TGRS Research Map | TGRS