Exploring the critical waste factors affecting highway construction projects in Pakistan

Highway construction projects are known for their propensity to consume enormous quantities of materials and their susceptibility to generate considerable waste. Adequate research has been conducted on identifying the causes of waste produced in building projects, however, there are limited studies available on identifying causative factors for highway projects. This study aims to identify and evaluate the causes and factors of waste generated on highway projects using a literature review and questionnaire survey technique. Causes leading to waste in highway projects were identified from the literature as well as from highway construction experts. Subsequently, quantitative data were collected from 127 highway construction professionals using a Likert Scale questionnaire survey, which was ranked using the Relative Importance Index (RII) and further analyzed by using a very robust Factor Analysis (FA) technique. RII results highlight the most significant causes of waste in highway construction, while FA suggests the main factors contributing to the waste in highway projects. The top five most significant causes of waste revealed by this study were: (1) mistakes of surveyors, (2) faulty drawings, (3) incompetence of quantity surveyors, (4) faulty/substandard work, and (5) poor workers' skills, whereas the seven waste factor groups evaluated by the study were: (1) design, (2) storage, (3) survey, (4) workers, (5) waste management, (6) site management, and (7) external. This study further suggested waste management and mitigation strategies for highway construction projects corresponding to each factor group. This is a novel study on waste generation in highway projects in Pakistan and will assist academia and industry practitioners in understanding and controlling construction waste generation in highway projects during various stages of project execution.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2025-05-28
DOI
https://doi.org/10.1371/journal.pone.0323841
Citations
1
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the critical waste factors affecting highway construction projects in Pakistan

Mughees Aslam, Javed Ahmed Khan Tipu, Farrokh Jaleel, Usman Aftab
1 citations
PLoS ONE
Recycled Aggregate Concrete Performance
1.01
article

Exploring the critical waste factors affecting highway construction projects in Pakistan

Mughees Aslam, Javed Ahmed Khan Tipu, Farrokh Jaleel, Usman Aftab
article en
1 citations

Abstract

Highway construction projects are known for their propensity to consume enormous quantities of materials and their susceptibility to generate considerable waste. Adequate research has been conducted on identifying the causes of waste produced in building projects, however, there are limited studies available on identifying causative factors for highway projects. This study aims to identify and evaluate the causes and factors of waste generated on highway projects using a literature review and questionnaire survey technique. Causes leading to waste in highway projects were identified from the literature as well as from highway construction experts. Subsequently, quantitative data were collected from 127 highway construction professionals using a Likert Scale questionnaire survey, which was ranked using the Relative Importance Index (RII) and further analyzed by using a very robust Factor Analysis (FA) technique. RII results highlight the most significant causes of waste in highway construction, while FA suggests the main factors contributing to the waste in highway projects. The top five most significant causes of waste revealed by this study were: (1) mistakes of surveyors, (2) faulty drawings, (3) incompetence of quantity surveyors, (4) faulty/substandard work, and (5) poor workers' skills, whereas the seven waste factor groups evaluated by the study were: (1) design, (2) storage, (3) survey, (4) workers, (5) waste management, (6) site management, and (7) external. This study further suggested waste management and mitigation strategies for highway construction projects corresponding to each factor group. This is a novel study on waste generation in highway projects in Pakistan and will assist academia and industry practitioners in understanding and controlling construction waste generation in highway projects during various stages of project execution.

PLoS ONEVol. 20(5)
International Islamic University, Islamabad (PK), University of Balochistan (PK), National University of Sciences and Technology (PK)
Openalex Percentile: Top 25%
Recycled Aggregate Concrete Performance
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.