Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects

Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-05-27
DOI
https://doi.org/10.3390/buildings15111835
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects

Pablo Guindos, Harrison Mesa, Claudio Mourgues, Claudia Rojas et al.
Buildings
BIM and Construction Integration
article

Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects

Pablo Guindos, Harrison Mesa, Claudio Mourgues, Claudia Rojas, Francisco Ruz, Pilar de la Rosa
article en

Abstract

Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.

BuildingsVol. 15(11)
Universidade da Coruña (ES), Pontificia Universidad Católica de Chile (CL)
Openalex Percentile: Top 88%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.