BIM maturity and its influence on BIM implementation challenges: the perspectives of UK contractors

Building information modelling (BIM) offers a powerful means to enhance collaboration and efficiency in construction project delivery. However, many organisations still face persistent technical, organisational, and environmental challenges during implementation. BIM maturity has emerged as a key factor in addressing these issues, yet few studies have empirically examined how maturity influences the ability to manage such challenges. This study investigates how BIM maturity affects implementation challenges from the perspective of UK construction contractors. The research adopted a quantitative approach using a structured questionnaire administered to 65 professionals from UK contracting organisations. The survey measured BIM maturity across technology, process, and policy domains and examined how organisations manage common implementation challenges. The analysis employed descriptive statistics, Spearman’s rank correlation, and independent-sample t-tests. Findings reveal that most organisations operate at Capability Stage 2, with moderate maturity across key BIM areas. Technological maturity, especially in software use, ranked highest. Organisations with higher BIM maturity managed challenges more effectively, although the correlation was moderate. These results underscore the value of assessing and developing BIM maturity as a strategic tool for overcoming barriers. Practically, construction firms can use maturity assessments to identify gaps, prioritise improvements, and enhance BIM implementation success across their projects.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Management Procurement and Law
Published
2025-05-27
DOI
https://doi.org/10.1680/jmapl.24.00084
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM maturity and its influence on BIM implementation challenges: the perspectives of UK contractors

Abhinesh Prabhakaran, Ernest Kissi, Hayford Pittri, Patrick Manu et al.
1 citations
Proceedings of the Institution of Civil Engineers - Management Procurement and Law
BIM and Construction Integration
1.01
article

BIM maturity and its influence on BIM implementation challenges: the perspectives of UK contractors

Abhinesh Prabhakaran, Ernest Kissi, Hayford Pittri, Patrick Manu, Colin Anthony Booth, Abdul‐Majeed Mahamadu, Kofı Agyekum, Dalia Al-Tarazi, Lampros Arvanitis
article en
1 citations

Abstract

Building information modelling (BIM) offers a powerful means to enhance collaboration and efficiency in construction project delivery. However, many organisations still face persistent technical, organisational, and environmental challenges during implementation. BIM maturity has emerged as a key factor in addressing these issues, yet few studies have empirically examined how maturity influences the ability to manage such challenges. This study investigates how BIM maturity affects implementation challenges from the perspective of UK construction contractors. The research adopted a quantitative approach using a structured questionnaire administered to 65 professionals from UK contracting organisations. The survey measured BIM maturity across technology, process, and policy domains and examined how organisations manage common implementation challenges. The analysis employed descriptive statistics, Spearman’s rank correlation, and independent-sample t-tests. Findings reveal that most organisations operate at Capability Stage 2, with moderate maturity across key BIM areas. Technological maturity, especially in software use, ranked highest. Organisations with higher BIM maturity managed challenges more effectively, although the correlation was moderate. These results underscore the value of assessing and developing BIM maturity as a strategic tool for overcoming barriers. Practically, construction firms can use maturity assessments to identify gaps, prioritise improvements, and enhance BIM implementation success across their projects.

Proceedings of the Institution of Civil Engineers - Management Procurement and LawVol. 178(4)
Zarqa University (JO), Queen Mary University of London (GB), University of the West of England (GB), Kwame Nkrumah University of Science and Technology (GH), Heriot-Watt University (GB), University College London (GB)
Openalex Percentile: Top 25%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.