General Framework for Processing Time Prediction and Machine Availability for all Fab Equipment

This paper presents a novel approach that significantly improves processing time (PT) and machine availability predictions across all tools in a GlobalFoundries semiconductor fabrication plant. An attention-based deep neural network was developed to enhance prediction accuracy. The model achieved a 50% to 80% reduction in Mean Absolute Error for PT and machine availability predictions, compared to a baseline statistical model. Deployment on three bottleneck tool families led to a 3% to 7% improvement in chamber utilization. The model is being expanded to all GlobalFoundries' facilities, with expected similar outcomes.

Authors

Institutions

Publication Details

Published
2025-05-05
DOI
https://doi.org/10.1109/asmc64512.2025.11010438
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

General Framework for Processing Time Prediction and Machine Availability for all Fab Equipment

Jeroen Bédorf, Srikanth Ramakrishnan, Detlef Pabst, S. Chakravorty et al.
Manufacturing Process and Optimization
article

General Framework for Processing Time Prediction and Machine Availability for all Fab Equipment

Jeroen Bédorf, Srikanth Ramakrishnan, Detlef Pabst, S. Chakravorty, James DeLong, Jayakar Thomas, Abhinav Kaushik, T. E. Korabi, T. Hewlett, G. Goossen, J. van Heugten
article en

Abstract

This paper presents a novel approach that significantly improves processing time (PT) and machine availability predictions across all tools in a GlobalFoundries semiconductor fabrication plant. An attention-based deep neural network was developed to enhance prediction accuracy. The model achieved a 50% to 80% reduction in Mean Absolute Error for PT and machine availability predictions, compared to a baseline statistical model. Deployment on three bottleneck tool families led to a 3% to 7% improvement in chamber utilization. The model is being expanded to all GlobalFoundries' facilities, with expected similar outcomes.

Applied Minds (United States) (US), GlobalFoundries (United States) (US)
Openalex Percentile: Top 84%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

General Framework for Processing Time Prediction and Machine Availability for all Fab Equipment — Jeroen Bédorf, Srikanth Ramakrishnan, et al. · (2025) | TGRS Research Map | TGRS