PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II PADA FASILITAS PRODUKSI KRITIS PERUSAHAAN BAJA

One of the largest steel industries in Indonesia produces cold-rolled sheet steel, with production handled by the Cold Rolling Mill Factory. This study focuses on the Continuous Pickling Line and Continuous Tandem Cold Mill units, which have the highest downtime of 230 hours, resulting in a delay cost of 6 billion Rupiah. The objective is to identify the functions, failures, causes, and impacts on critical components, and to propose appropriate maintenance activities and intervals. Failure information is gathered using failure mode and effect analysis (FMEA), while the appropriate maintenance activities are determined using a reliability-centered maintenance II decision worksheet. The study identifies four critical components in the CPL unit and five in the CTCM unit. Five failure modes are addressed by on-condition scheduling, seven by restoration scheduling, and seven by failure interval. Proposed maintenance intervals for on-condition scheduling include 9,413 minutes for stand #5, 8,371 minutes for stand #4, 12,383 minutes for stand #3, 12,996 minutes for stand #2, and 7,123 minutes for stand #1. Restoration scheduling intervals are 34,000 minutes for the saddle breaker, 21,000 minutes for the wiper, and between 12,000–23,000 minutes for other components. Failure interval maintenance for the welder, pickling tank, and stands ranges from 2,409 to 6,540 minutes.

Authors

Publication Details

Journal
JURNAL REKAYASA SISTEM INDUSTRI
Published
2025-05-27
DOI
https://doi.org/10.33884/jrsi.v10i2.9418
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II PADA FASILITAS PRODUKSI KRITIS PERUSAHAAN BAJA

Sherin Ramadhania, Muhammad Suryo Panotogomo Abi Suroso, Nia Sastra Permata, Achmad Samudra Dewantara
JURNAL REKAYASA SISTEM INDUSTRI
Management and Optimization Techniques
article

PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II PADA FASILITAS PRODUKSI KRITIS PERUSAHAAN BAJA

Sherin Ramadhania, Muhammad Suryo Panotogomo Abi Suroso, Nia Sastra Permata, Achmad Samudra Dewantara
article en

Abstract

One of the largest steel industries in Indonesia produces cold-rolled sheet steel, with production handled by the Cold Rolling Mill Factory. This study focuses on the Continuous Pickling Line and Continuous Tandem Cold Mill units, which have the highest downtime of 230 hours, resulting in a delay cost of 6 billion Rupiah. The objective is to identify the functions, failures, causes, and impacts on critical components, and to propose appropriate maintenance activities and intervals. Failure information is gathered using failure mode and effect analysis (FMEA), while the appropriate maintenance activities are determined using a reliability-centered maintenance II decision worksheet. The study identifies four critical components in the CPL unit and five in the CTCM unit. Five failure modes are addressed by on-condition scheduling, seven by restoration scheduling, and seven by failure interval. Proposed maintenance intervals for on-condition scheduling include 9,413 minutes for stand #5, 8,371 minutes for stand #4, 12,383 minutes for stand #3, 12,996 minutes for stand #2, and 7,123 minutes for stand #1. Restoration scheduling intervals are 34,000 minutes for the saddle breaker, 21,000 minutes for the wiper, and between 12,000–23,000 minutes for other components. Failure interval maintenance for the welder, pickling tank, and stands ranges from 2,409 to 6,540 minutes.

JURNAL REKAYASA SISTEM INDUSTRIVol. 10(2)
Openalex Percentile: Top 83%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II PADA FASILITAS PRODUKSI KRITIS PERUSAHAAN BAJA — Sherin Ramadhania, Muhammad Suryo Panotogomo Abi Suroso, et al. · JURNAL REKAYASA SISTEM INDUSTRI (2025) | TGRS Research Map | TGRS