Study on the construction method for in-situ expansion of existing large cross-section tunnels

This paper takes the in-situ expansion project of the Dachangshan tunnel as a case study to compare and optimize the construction method for the in-situ expansion of existing large cross-section tunnels. The deformation of the tunnel, the stress distribution of the surrounding rock, and the force on the tunnel support under three different construction schemes are examined in the paper. The results indicate that the “from top to bottom” construction scheme is superior to the “from left to right” scheme in terms of managing deformation and minimizing the demolition risk of the existing secondary lining. Moreover, the “from sidewall to inverted arch” construction scheme is more effective in controlling the deformation of the surrounding rock and reducing the stress on the initial support of the new tunnel. In particular, the risk of the secondary lining demolition has been evaluated, and it was reduced by adding steel pipe brace support. Finally, the field monitoring results verify the accuracy of the numerical calculation results and the safety of the optimal construction scheme.

Authors

Institutions

Publication Details

Journal
Discover Applied Sciences
Published
2025-05-27
DOI
https://doi.org/10.1007/s42452-025-07132-9
Citations
2
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
2.61
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the construction method for in-situ expansion of existing large cross-section tunnels

Lei Liu, Jiajia Yan, Hao Cui, Chen Xiaojie et al.
2 citations
Discover Applied Sciences
Geotechnical Engineering and Analysis
2.61
article

Study on the construction method for in-situ expansion of existing large cross-section tunnels

Lei Liu, Jiajia Yan, Hao Cui, Chen Xiaojie, Dong Li, Han Dayong, Zhong Xingwu, Yan Zihai
article en
2 citations

Abstract

This paper takes the in-situ expansion project of the Dachangshan tunnel as a case study to compare and optimize the construction method for the in-situ expansion of existing large cross-section tunnels. The deformation of the tunnel, the stress distribution of the surrounding rock, and the force on the tunnel support under three different construction schemes are examined in the paper. The results indicate that the “from top to bottom” construction scheme is superior to the “from left to right” scheme in terms of managing deformation and minimizing the demolition risk of the existing secondary lining. Moreover, the “from sidewall to inverted arch” construction scheme is more effective in controlling the deformation of the surrounding rock and reducing the stress on the initial support of the new tunnel. In particular, the risk of the secondary lining demolition has been evaluated, and it was reduced by adding steel pipe brace support. Finally, the field monitoring results verify the accuracy of the numerical calculation results and the safety of the optimal construction scheme.

Discover Applied SciencesVol. 7(6)
Construction Development (Qatar) (QA), PowerChina (China) (CN), Zhejiang Lab (CN), Powerchina Huadong Engineering Corporation (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 12%
Geotechnical Engineering and Analysis
2.61
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.