Cost Analysis of Power Transmission and Transformation Projects Based on the Whole Life Cycle Theory

This article analyzes the cost of power transmission and transformation projects based on the theory of the entire lifecycle. A cost model for the retirement and scrapping stages of a project has been developed, and a calculation model for the optimal retirement period of transformers has been proposed, taking into account both economic benefits and physical lifespan. Through case analysis, it has been determined that the economic retirement life of the transformer is 36 years and the physical life is 45.4 years. It is recommended that the total life cycle of the substation project be 30 years. The research provides a theoretical basis for cost control and project planning in the power industry.

Authors

Publication Details

Published
2024-12-06
DOI
https://doi.org/10.1145/3727993.3728053
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Analysis of Power Transmission and Transformation Projects Based on the Whole Life Cycle Theory

Fan Yao
1 citations
BIM and Construction Integration
0.27
article

Cost Analysis of Power Transmission and Transformation Projects Based on the Whole Life Cycle Theory

Fan Yao
article en
1 citations

Abstract

This article analyzes the cost of power transmission and transformation projects based on the theory of the entire lifecycle. A cost model for the retirement and scrapping stages of a project has been developed, and a calculation model for the optimal retirement period of transformers has been proposed, taking into account both economic benefits and physical lifespan. Through case analysis, it has been determined that the economic retirement life of the transformer is 36 years and the physical life is 45.4 years. It is recommended that the total life cycle of the substation project be 30 years. The research provides a theoretical basis for cost control and project planning in the power industry.

Responsible consumption and production, Zero hunger
Openalex Percentile: Top 39%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Analysis of Power Transmission and Transformation Projects Based on the Whole Life Cycle Theory — Fan Yao · (2024) | TGRS Research Map | TGRS