Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT)

This study aims to examine the application of the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) in optimizing project time management. The research method used is a literature study by analyzing various scientific references related to CPM and PERT. The results show that CPM is effective in identifying the critical path of a project that directly impacts project duration, while PERT excels in managing project time uncertainty through a probabilistic approach. The analysis indicates that combining both methods can enhance the accuracy of project time planning, minimize delay risks, and ensure optimal resource utilization. The conclusion of this study is that CPM and PERT have their respective advantages in project time management, and their simultaneous application can be an effective strategy for achieving project objectives more efficiently. Therefore, project managers are advised to understand the project characteristics and select the appropriate method to optimize project time management.

Authors

Institutions

Publication Details

Journal
Jurnal Aplikasi Pelayaran dan Kepelabuhanan
Published
2025-05-26
DOI
https://doi.org/10.30649/japk.v15i2.160
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT)

Ahmad Ridwan
1 links
Jurnal Aplikasi Pelayaran dan Kepelabuhanan
Resource-Constrained Project Scheduling
article

Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT)

Ahmad Ridwan
article en

Abstract

This study aims to examine the application of the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) in optimizing project time management. The research method used is a literature study by analyzing various scientific references related to CPM and PERT. The results show that CPM is effective in identifying the critical path of a project that directly impacts project duration, while PERT excels in managing project time uncertainty through a probabilistic approach. The analysis indicates that combining both methods can enhance the accuracy of project time planning, minimize delay risks, and ensure optimal resource utilization. The conclusion of this study is that CPM and PERT have their respective advantages in project time management, and their simultaneous application can be an effective strategy for achieving project objectives more efficiently. Therefore, project managers are advised to understand the project characteristics and select the appropriate method to optimize project time management.

Jurnal Aplikasi Pelayaran dan KepelabuhananVol. 15(2)
Universitas Islam Lamongan (ID)
Openalex Percentile: Top 87%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.