Analysis of Ship Manning in the Crewing Department in Preventing Crew on Board Delays at PT. Pelayaran Andalas Bahtera Baruna Jakarta

The crew is the main element in running the ship's operations. It is important to procure or dispatch crew members. However, crew dispatch has a relatively long and drawn-out process and often crew members do not follow the process according to schedule, causing delays. This research is a qualitative study that aims to determine the causes of crew on board delays. Data collection in this study used interviews, observation, and documentation methods. The results of this study indicate that there are obstacles in the ship's crew process. From the results of data analysis, the causes of crew on board delays are due to several factors, namely delays in certificate revalidation, difficulty in finding candidates according to qualifications, and sudden changes in crew requests. Efforts that can be made in overcoming this delay problem include giving a statement letter and sanctions if you do not follow existing procedures.

Authors

Institutions

Publication Details

Journal
Jurnal Aplikasi Pelayaran dan Kepelabuhanan
Published
2025-05-26
DOI
https://doi.org/10.30649/japk.v15i2.145
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Ship Manning in the Crewing Department in Preventing Crew on Board Delays at PT. Pelayaran Andalas Bahtera Baruna Jakarta

Beni Agus Setiono, Didik Purwiyanto, Fauzi Alwi Yasin
Jurnal Aplikasi Pelayaran dan Kepelabuhanan
Occupational Health and Safety Management
article

Analysis of Ship Manning in the Crewing Department in Preventing Crew on Board Delays at PT. Pelayaran Andalas Bahtera Baruna Jakarta

Beni Agus Setiono, Didik Purwiyanto, Fauzi Alwi Yasin
article en

Abstract

The crew is the main element in running the ship's operations. It is important to procure or dispatch crew members. However, crew dispatch has a relatively long and drawn-out process and often crew members do not follow the process according to schedule, causing delays. This research is a qualitative study that aims to determine the causes of crew on board delays. Data collection in this study used interviews, observation, and documentation methods. The results of this study indicate that there are obstacles in the ship's crew process. From the results of data analysis, the causes of crew on board delays are due to several factors, namely delays in certificate revalidation, difficulty in finding candidates according to qualifications, and sudden changes in crew requests. Efforts that can be made in overcoming this delay problem include giving a statement letter and sanctions if you do not follow existing procedures.

Jurnal Aplikasi Pelayaran dan KepelabuhananVol. 15(2)
Universitas Hang Tuah (ID)
Openalex Percentile: Top 83%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.