Utilization of Delayed Opening Ball Seat Technology in Liner Hanger Operations in the United Arab Emirates
The escalating global demand for energy is exerting significant pressure on the oil & gas industry to fulfill the energy requirements while ensuring economic efficiency and environmental sustainability. As the world continues to industrialize and urbanize, the need for energy resources has grown exponentially. This surge in demand has led to the exploration and extraction of oil from deeper and more challenging reservoirs, presenting significant challenges for the industry. These challenges include not only the technical difficulties associated with drilling at greater depths but also the need to maintain economic viability and minimize environmental impact. The overall drilling process becomes increasingly complicated as companies strive to balance these competing priorities. In the 1920s, Liner Hanger Technology was introduced in the energy industry with the aim to secure casing liners, enabling more effective, enhanced, and efficient well construction. This technology was a significant advancement at the time, providing a means to stabilize the wellbore and improve the overall integrity of the well. Over the years, liner hanger technology has evolved significantly, becoming more sophisticated to address the deeper and more complex wellbore conditions encountered in modern drilling operations. The evolution of this technology has seen a transition from basic mechanical set-hangers to highly advanced, automated, and smart technologies that offer greater precision and control. Despite these advancements, it remains impossible to eliminate the risks associated with running liner technology in challenging wells. These risks include weak formation, wellbore instability, sudden reservoir pressure changes, formation damage, hydraulic pressures, and more. The implications of these risks can be severe, resulting in loss of well control, blowouts, equipment damage, safety hazards, increased operational costs, and environmental impacts. The conventional methods to deploy liner hanger in a single trip become particularly challenging when excessive "weaker reservoir/formations" are involved. Running a liner in a weak reservoir requires careful planning and advanced technology to mitigate the associated risks of formation instability, stuck pipe, and wellbore damage. Differential pressure management, reduction in excessive surging, and fit-for-purpose technology are critical to confine the challenges encountered due to weak reservoirs. The delayed opening ball seat (DOBS) technology is a novel solution for liner hanger operations in weak reservoirs, where conventional methods may cause formation damage and losses. The DOBS technology allows the operator to isolate the weak zone during the cementing operation and then open the ball seat at a later stage, when the cement has set, and the formation is stabilized. This innovative approach provides a higher degree of control over the well completion process, ensuring that the weak zone is protected during critical stages of the operation.
Authors
- Mohamed Qassem Hussain
- Awad Ageel Al-rashdi
- M. El-Mahdy (ORCID: https://orcid.org/0000-0002-8316-7580)
- B. Kodiah
- Moza Alteneiji (ORCID: https://orcid.org/0000-0003-3078-1816)
- Mohammad Husien
- Maha Nour (ORCID: https://orcid.org/0000-0001-5879-7380)
- A. Elkasrawi
- Ahmed M. Ibrahim (ORCID: https://orcid.org/0000-0002-0367-7768)
- Neha Porwal
- Y. Ambre
Institutions
- Baker Hughes (United States) (US)
- Abu Dhabi National Oil (United Arab Emirates) (AE)
Publication Details
- Journal
- SPE/IADC Middle East Drilling Technology Conference and Exhibition
- Published
- 2025-05-27
- DOI
- https://doi.org/10.2118/225731-ms
- Primary Topic
- Advanced Manufacturing and Logistics Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00