Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects

This paper presents the results of research on anticipation and solutions for material cost overrun in the open system Toll Road project in Jadebotabek. The purpose of this study is to determine the anticipation and solutions for handling material cost overrun. This study was conducted by surveying 76 correspondents consisting of Managers, Consultants and Contractors involved in the construction of Toll roads in Jadebotabek. The survey results were tested for validity and reliability to determine the dominant factors causing cost overrun, then the development of anticipation and solutions for handling material cost overrun was carried out by a team of experts. The results of the study showed that there were 10 valid factors causing cost overrun with a coefficient value of 0.389 - 0.716 and 13 reliable factors causing cost overrun with a Cronbach's alpha value above 0.700. The results of this study also show that anticipation and solutions for handling material cost overrun in toll road projects are preventive measures to reduce and eliminate the occurrence of cost overrun at the planning stage and at the implementation stage.

Authors

Publication Details

Journal
ASTONJADRO
Published
2025-05-14
DOI
https://doi.org/10.32832/astonjadro.v14i2.18377
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects

Muhammad Nafhan Isfahani, Antonius Antonius, Kartono Wibowo
ASTONJADRO
BIM and Construction Integration
article

Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects

Muhammad Nafhan Isfahani, Antonius Antonius, Kartono Wibowo
article en

Abstract

This paper presents the results of research on anticipation and solutions for material cost overrun in the open system Toll Road project in Jadebotabek. The purpose of this study is to determine the anticipation and solutions for handling material cost overrun. This study was conducted by surveying 76 correspondents consisting of Managers, Consultants and Contractors involved in the construction of Toll roads in Jadebotabek. The survey results were tested for validity and reliability to determine the dominant factors causing cost overrun, then the development of anticipation and solutions for handling material cost overrun was carried out by a team of experts. The results of the study showed that there were 10 valid factors causing cost overrun with a coefficient value of 0.389 - 0.716 and 13 reliable factors causing cost overrun with a Cronbach's alpha value above 0.700. The results of this study also show that anticipation and solutions for handling material cost overrun in toll road projects are preventive measures to reduce and eliminate the occurrence of cost overrun at the planning stage and at the implementation stage.

ASTONJADROVol. 14(2)
Openalex Percentile: Top 88%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects — Muhammad Nafhan Isfahani, Antonius Antonius, et al. · ASTONJADRO (2025) | TGRS Research Map | TGRS