Optimization of the production process using simulation modeling

This document seeks to enhance the manufacturing procedure of graphics card assembly within a certain organization. To enhance the manufacturing workflow, The Siemens Tecnomatix Plant Simulation application is utilized. The initial and crucial action to enhance the production procedure is to examine the existing workflow to identify where delays or interruptions are happening. Consequently, the initial simulation focusses on the existing manufacturing procedure. During the subsequent trial, the modifications have effectively executed all the suggested modifications in the enhanced production procedure. The encompassed substituting the human labour force with a pair of machines in the tenth phase, which entails the construction of sizable parts. The execution of the enhanced procedure enables the assembly of 44 graphics cards within a single hour, marking a rise of 15 graphics cards relative to the existing method. During a work period of eight hours, a total of 353 graphics cards can be put together, exceeding the existing production method by 118 graphics cards.

Authors

Publication Details

Journal
World Journal of Advanced Engineering Technology and Sciences
Published
2025-05-25
DOI
https://doi.org/10.30574/wjaets.2025.15.2.0790
Primary Topic
Transport and Logistics Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of the production process using simulation modeling

Chinedu James Ujam
World Journal of Advanced Engineering Technology and Sciences
Transport and Logistics Innovations
article

Optimization of the production process using simulation modeling

Chinedu James Ujam
article en

Abstract

This document seeks to enhance the manufacturing procedure of graphics card assembly within a certain organization. To enhance the manufacturing workflow, The Siemens Tecnomatix Plant Simulation application is utilized. The initial and crucial action to enhance the production procedure is to examine the existing workflow to identify where delays or interruptions are happening. Consequently, the initial simulation focusses on the existing manufacturing procedure. During the subsequent trial, the modifications have effectively executed all the suggested modifications in the enhanced production procedure. The encompassed substituting the human labour force with a pair of machines in the tenth phase, which entails the construction of sizable parts. The execution of the enhanced procedure enables the assembly of 44 graphics cards within a single hour, marking a rise of 15 graphics cards relative to the existing method. During a work period of eight hours, a total of 353 graphics cards can be put together, exceeding the existing production method by 118 graphics cards.

World Journal of Advanced Engineering Technology and SciencesVol. 15(2)
Openalex Percentile: Top 84%
Transport and Logistics Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.