Implementation of Fuzzy Sugeno in the Analysis of the Availability of Split Stone

The development of companies in the industrial sector continues to grow every where. So the level of competition is competitive more increasing. But due to consumer demand that changes, making it a problem serious at the company PT Dexton Mulia Wisesa. especially the demand for split stone. To overcome this problem, a optimization in production quantities so that this does not happen production shortages or excess goods available causing the company to lose. Optimization is possible done by implementing Sugeno fuzzy logic. Sugeno's selection of fuzzy logic is for produce a capable system model estimate the amount of crushed stone inventory. Results from research conducted in July 2023 until June 2024 obtain mape value amounting to 28% and is included in the reasonable category. So it is hoped that in the future, this company can optimize the need for split stone in production.

Authors

Institutions

Publication Details

Journal
Journal of Information System Research (JOSH)
Published
2024-10-27
DOI
https://doi.org/10.47065/josh.v6i1.5982
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of Fuzzy Sugeno in the Analysis of the Availability of Split Stone

Sriani Sriani, Ari Anshari Yuliansyah Siregar
Journal of Information System Research (JOSH)
BIM and Construction Integration
article

Implementation of Fuzzy Sugeno in the Analysis of the Availability of Split Stone

Sriani Sriani, Ari Anshari Yuliansyah Siregar
article en

Abstract

The development of companies in the industrial sector continues to grow every where. So the level of competition is competitive more increasing. But due to consumer demand that changes, making it a problem serious at the company PT Dexton Mulia Wisesa. especially the demand for split stone. To overcome this problem, a optimization in production quantities so that this does not happen production shortages or excess goods available causing the company to lose. Optimization is possible done by implementing Sugeno fuzzy logic. Sugeno's selection of fuzzy logic is for produce a capable system model estimate the amount of crushed stone inventory. Results from research conducted in July 2023 until June 2024 obtain mape value amounting to 28% and is included in the reasonable category. So it is hoped that in the future, this company can optimize the need for split stone in production.

Journal of Information System Research (JOSH)Vol. 6(1)
North Sumatra Islamic University (ID)
Openalex Percentile: Top 69%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.