Alternative binary green oxidant application for environmentally friendly treatment of leachate membrane bioreactor effluent

In this study, the treatability of leachate membrane bioreactor (MBR) effluent was investigated by CaO 2 /PS/Fe(II) and CaO 2 /PMS/Fe(II) processes. While existing studies focus on synthetic wastewater, this work evaluates CaO 2 /PS/Fe(II) and CaO 2 /PMS/Fe(II) processes for real leachate MBR effluent. The study will highlight the potential of using green oxidants and catalysts in the treatment. Environmentally friendly oxidants (CaO 2 , PS, and PMS) and environmentally friendly catalysts (Fe(II), which is defined as environmentally friendly with its properties such as low cost, abundance, low toxicity, and sustainability) were used. The COD removal efficiencies of binary processes were higher than those of single processes, and the highest COD removal efficiencies were achieved with combined processes. Box-Behnken Design (BBD) was applied to determine the effects of process variables on the combined processes. The optimum conditions were initial pH 6.92, Fe(II) dose 2.72 g/L, CaO 2 dose 3.65 g/L, and PS dose 3.89 g/L for CaO 2 /PS/Fe(II) while initial pH 7.22, Fe(II) dose 2.74 g/L, CaO 2 dose 3.37 g/L, and PMS dose 4.65 g/L for CaO 2 /PMS/Fe(II). Under optimum conditions, COD and UV 254 removal were estimated as 89.5 % and 98.9 %, respectively for CaO 2 /PS/Fe(II) and 92.7 % and 99.7 %, respectively for CaO 2 /PMS/Fe(II). To verify the data, validation experiments were conducted and COD and UV 254 removal were 87.5 % and 96.2 % for CaO 2 /PS/Fe(II) and 90.1 % and 97.6 % for CaO 2 /PMS/Fe(II), respectively. Minor deviations (<3 %) between predicted and experimental results are attributed to wastewater heterogeneity and experimental margins. Combined green oxidation processes effectively treated the leachate MBR effluent meeting the discharge criteria desired for the receiving media. • Binary oxidants application was increased pollutant removal. • Process parameters were effectively modeled by Box-Behnken Design. • CaO 2 and peroxymonosulfate (PMS) provided slightly higher yields. • COD and UV 254 removal was 90.1 % and 97.6 % for CaO 2 /PMS/Fe(II) process.

Authors

Institutions

Publication Details

Journal
Journal of Water Process Engineering
Published
2025-05-24
DOI
https://doi.org/10.1016/j.jwpe.2025.107965
Primary Topic
Advanced oxidation water treatment
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Alternative binary green oxidant application for environmentally friendly treatment of leachate membrane bioreactor effluent

Emine Can‐Güven, Gamze Varank, Senem Yazıcı Güvenç, Rabia Nefise Yılmaz et al.
Journal of Water Process Engineering
Advanced oxidation water treatment
article

Alternative binary green oxidant application for environmentally friendly treatment of leachate membrane bioreactor effluent

Emine Can‐Güven, Gamze Varank, Senem Yazıcı Güvenç, Rabia Nefise Yılmaz, Şebnem Gün, Çağla Kürkçü
article en

Abstract

In this study, the treatability of leachate membrane bioreactor (MBR) effluent was investigated by CaO 2 /PS/Fe(II) and CaO 2 /PMS/Fe(II) processes. While existing studies focus on synthetic wastewater, this work evaluates CaO 2 /PS/Fe(II) and CaO 2 /PMS/Fe(II) processes for real leachate MBR effluent. The study will highlight the potential of using green oxidants and catalysts in the treatment. Environmentally friendly oxidants (CaO 2 , PS, and PMS) and environmentally friendly catalysts (Fe(II), which is defined as environmentally friendly with its properties such as low cost, abundance, low toxicity, and sustainability) were used. The COD removal efficiencies of binary processes were higher than those of single processes, and the highest COD removal efficiencies were achieved with combined processes. Box-Behnken Design (BBD) was applied to determine the effects of process variables on the combined processes. The optimum conditions were initial pH 6.92, Fe(II) dose 2.72 g/L, CaO 2 dose 3.65 g/L, and PS dose 3.89 g/L for CaO 2 /PS/Fe(II) while initial pH 7.22, Fe(II) dose 2.74 g/L, CaO 2 dose 3.37 g/L, and PMS dose 4.65 g/L for CaO 2 /PMS/Fe(II). Under optimum conditions, COD and UV 254 removal were estimated as 89.5 % and 98.9 %, respectively for CaO 2 /PS/Fe(II) and 92.7 % and 99.7 %, respectively for CaO 2 /PMS/Fe(II). To verify the data, validation experiments were conducted and COD and UV 254 removal were 87.5 % and 96.2 % for CaO 2 /PS/Fe(II) and 90.1 % and 97.6 % for CaO 2 /PMS/Fe(II), respectively. Minor deviations (<3 %) between predicted and experimental results are attributed to wastewater heterogeneity and experimental margins. Combined green oxidation processes effectively treated the leachate MBR effluent meeting the discharge criteria desired for the receiving media. • Binary oxidants application was increased pollutant removal. • Process parameters were effectively modeled by Box-Behnken Design. • CaO 2 and peroxymonosulfate (PMS) provided slightly higher yields. • COD and UV 254 removal was 90.1 % and 97.6 % for CaO 2 /PMS/Fe(II) process.

Journal of Water Process EngineeringVol. 75
Istanbul Technical University (TR)
Yildiz Teknik Üniversitesi
Openalex Percentile: Top 88%
Advanced oxidation water treatment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.