The commissioning of the Upstream Tracker for the LHCb upgrade

The LHCb detector has undergone a major upgrade that will enable the experiment to acquire data with an all-software trigger, made possible by front-end readout in real-time and the capabilities of performing the data selection algorithm while the data are acquired. To achieve this goal, almost all detector subsystems have been replaced by new designs mandated by the processing speed requirements. At the heart of the real-time analysis is a fast and efficient track reconstruction, without spurious tracks composed of segments associated with hits from different charged particles. A detector crucial to the charged particle trajectory reconstruction is the Upstream Tracker (UT) (Collaboration, 2014), a 4-plane silicon microstrip detector in front of the dipole magnet. The UT also provides a momentum measurement, as it is in magnet’s fringe field. The UT comprises about 1000 sensors of four different designs, about 4000 dedicated front-end ASICs (SALT chips), performing analog processing, digitization, common-mode subtraction, and zero-suppression. Communications with the DAQ system are coordinated by a set of data control boards that also provide the optical interface. Four firmware algorithms are needed to process the UT data in the TELL40 readout boards because of the different data rates to be dealt with. We focus our report on the challenging task of ensuring that the excellent performance of the various detector components is maintained in the experiment environment and at the high rates expected. The UT was installed in LHCb in early 2023. The first year of commissioning was challenging for data synchronization issues related to specific properties of the GBTx chip. We report the lessons learned during the early commissioning phase and the upcoming run when the detector will be integrated in LHCb.

Authors

Institutions

Publication Details

Journal
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Published
2025-05-24
DOI
https://doi.org/10.1016/j.nima.2025.170619
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The commissioning of the Upstream Tracker for the LHCb upgrade

Carlos Abellán Beteta
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Particle Detector Development and Performance
article

The commissioning of the Upstream Tracker for the LHCb upgrade

Carlos Abellán Beteta
article en

Abstract

The LHCb detector has undergone a major upgrade that will enable the experiment to acquire data with an all-software trigger, made possible by front-end readout in real-time and the capabilities of performing the data selection algorithm while the data are acquired. To achieve this goal, almost all detector subsystems have been replaced by new designs mandated by the processing speed requirements. At the heart of the real-time analysis is a fast and efficient track reconstruction, without spurious tracks composed of segments associated with hits from different charged particles. A detector crucial to the charged particle trajectory reconstruction is the Upstream Tracker (UT) (Collaboration, 2014), a 4-plane silicon microstrip detector in front of the dipole magnet. The UT also provides a momentum measurement, as it is in magnet’s fringe field. The UT comprises about 1000 sensors of four different designs, about 4000 dedicated front-end ASICs (SALT chips), performing analog processing, digitization, common-mode subtraction, and zero-suppression. Communications with the DAQ system are coordinated by a set of data control boards that also provide the optical interface. Four firmware algorithms are needed to process the UT data in the TELL40 readout boards because of the different data rates to be dealt with. We focus our report on the challenging task of ensuring that the excellent performance of the various detector components is maintained in the experiment environment and at the high rates expected. The UT was installed in LHCb in early 2023. The first year of commissioning was challenging for data synchronization issues related to specific properties of the GBTx chip. We report the lessons learned during the early commissioning phase and the upcoming run when the detector will be integrated in LHCb.

Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated EquipmentVol. 1079
University of Zurich (CH)
Affordable and clean energy
Openalex Percentile: Top 94%
Particle Detector Development and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.