Reimagining Project Timelines: A Framework for Timely Delivery in Real Estate

Abstract - In the construction of systems in houses, time overruns are veritably pivotal factors which are related to cost, satisfaction of affected stakeholders and the completion of the design on schedule. This exploration establishes that the main factors leading to design detainments are as follows factors related to detainments in carrying necessary blessings or warrants, redesigns, lack of finances, shy number of workers, and ineffective construction operation. The exploration uses a multipurpose approach, empirical studies through literature reviews and stakeholder interviews, to address the linked enterprises and formulate an applicable result frame. The proposed frame considers the factors like enhancing design pretensions, operation of interest groups, and searching for advancements of work processes or operation of new technologies. Aimed at practicable recommendations, this study is anticipated to contribute to the enhancement of design completion in real estate sector and reduce the time and further sustainable practices within the sector Key Words: Time overrun, real estate delays, project lifecycle optimization, mitigation strategies, construction project efficiency.

Authors

Publication Details

Journal
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
Published
2025-05-23
DOI
https://doi.org/10.55041/ijsrem48589
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reimagining Project Timelines: A Framework for Timely Delivery in Real Estate

Yashraj Dhiraj Ingole
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
BIM and Construction Integration
article

Reimagining Project Timelines: A Framework for Timely Delivery in Real Estate

Yashraj Dhiraj Ingole
article en

Abstract

Abstract - In the construction of systems in houses, time overruns are veritably pivotal factors which are related to cost, satisfaction of affected stakeholders and the completion of the design on schedule. This exploration establishes that the main factors leading to design detainments are as follows factors related to detainments in carrying necessary blessings or warrants, redesigns, lack of finances, shy number of workers, and ineffective construction operation. The exploration uses a multipurpose approach, empirical studies through literature reviews and stakeholder interviews, to address the linked enterprises and formulate an applicable result frame. The proposed frame considers the factors like enhancing design pretensions, operation of interest groups, and searching for advancements of work processes or operation of new technologies. Aimed at practicable recommendations, this study is anticipated to contribute to the enhancement of design completion in real estate sector and reduce the time and further sustainable practices within the sector Key Words: Time overrun, real estate delays, project lifecycle optimization, mitigation strategies, construction project efficiency.

INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENTVol. 09(05)
Openalex Percentile: Top 89%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.