Intelligent Optimization Method for Rebar Cutting in Pump Stations Based on Genetic Algorithm and BIM

As the construction industry shifts from an extensive development model to one characterized by intelligent structural systems, the imperative to enhance productivity and management efficiency has emerged as a critical challenge. Conventional rebar construction processes heavily rely on manual operations—such as on-site rebar cutting, manual transcription of material lists, and decentralized processing—which are susceptible to subjective errors and often result in significant material waste. This issue is particularly pronounced in large-scale projects, where disorganized management of rebar quantities and placements exacerbates inefficiencies. To address these challenges, this study proposes an integrated approach that synergistically combines a genetic algorithm-based rebar-cutting optimization model with BIM technology, thereby optimizing rebar management throughout the construction process. The research is structured into two primary components. Firstly, a one-dimensional mathematical model for rebar-cutting optimization is developed, incorporating an innovative real-number encoding strategy within the genetic algorithm framework to maximize material utilization. A case study conducted on a pump station project reveals that the utilization rates for 32 mm and 16 mm rebar reach 86.76% and 93.90%, respectively, significantly exceeding the industry standard of 80%. Secondly, an automated batch modeling tool is developed using C# and the Revit API, which enables the efficient generation of rebar components; a unique coding system is employed to establish a bidirectional mapping between the digital model and the physical rebar, ensuring precise positioning and effective information management. Overall, this integrated method—encompassing rebar-cutting optimization, digital modeling, and on-site intelligent management—not only mitigates material waste and reduces production costs but also markedly enhances construction efficiency and accuracy in complex projects, thereby providing robust technical support for the seamless integration of intelligent construction and industrialized building practices.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-05-23
DOI
https://doi.org/10.3390/buildings15111790
Citations
2
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
2.48

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent Optimization Method for Rebar Cutting in Pump Stations Based on Genetic Algorithm and BIM

Xiang Fu, Qiang Xie, Jiayu Huang, Kecheng Ji et al.
2 citations
Buildings
Advanced Manufacturing and Logistics Optimization
2.48
article

Intelligent Optimization Method for Rebar Cutting in Pump Stations Based on Genetic Algorithm and BIM

Xiang Fu, Qiang Xie, Jiayu Huang, Kecheng Ji, Yali Zhang
article en
2 citations

Abstract

As the construction industry shifts from an extensive development model to one characterized by intelligent structural systems, the imperative to enhance productivity and management efficiency has emerged as a critical challenge. Conventional rebar construction processes heavily rely on manual operations—such as on-site rebar cutting, manual transcription of material lists, and decentralized processing—which are susceptible to subjective errors and often result in significant material waste. This issue is particularly pronounced in large-scale projects, where disorganized management of rebar quantities and placements exacerbates inefficiencies. To address these challenges, this study proposes an integrated approach that synergistically combines a genetic algorithm-based rebar-cutting optimization model with BIM technology, thereby optimizing rebar management throughout the construction process. The research is structured into two primary components. Firstly, a one-dimensional mathematical model for rebar-cutting optimization is developed, incorporating an innovative real-number encoding strategy within the genetic algorithm framework to maximize material utilization. A case study conducted on a pump station project reveals that the utilization rates for 32 mm and 16 mm rebar reach 86.76% and 93.90%, respectively, significantly exceeding the industry standard of 80%. Secondly, an automated batch modeling tool is developed using C# and the Revit API, which enables the efficient generation of rebar components; a unique coding system is employed to establish a bidirectional mapping between the digital model and the physical rebar, ensuring precise positioning and effective information management. Overall, this integrated method—encompassing rebar-cutting optimization, digital modeling, and on-site intelligent management—not only mitigates material waste and reduces production costs but also markedly enhances construction efficiency and accuracy in complex projects, thereby providing robust technical support for the seamless integration of intelligent construction and industrialized building practices.

BuildingsVol. 15(11)
Chongqing University (CN), Chongqing Jiaotong University (CN)
Chongqing Science and Technology Commission, Centre Scientifique et Technique du Bâtiment
Openalex Percentile: Top 11%
Advanced Manufacturing and Logistics Optimization
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.