Comparing the Hydraulic Performance of Cold-Water Premise Plumbing Systems Designed Based on Traditional and Modern Peak Demand Estimates

Recent research has developed more accurate methods to estimate the peak demand for premise plumbing design in residential buildings. The improved accuracy produces lower design flow rates, leading to a reduction in pipe diameter, the size of pumps and control devices, and so on. Several industry case studies have presented the benefits of a reduced system size from cost, construction, embodied carbon, and energy consumption perspectives. However, little research has been done to (1) consider the wide array of demand scenarios (in addition to the peak demand) of premise plumbing systems (PPS), and (2) identify any potential risks aligned with improved peak demand estimation. To address the gap, the current study proposed a performance framework and used it to quantify and compare the performance (construction, hydraulics, energy consumption, and water quality) of PPS sized by a selected traditional and modern peak demand methods. Extended-period simulation (EPS) over a 24-h period at 1-s time steps is supported by a stochastic water demand model to enable the analysis of these PPS under a wide array of demand scenarios. For the PPS considered, the adoption of the modern peak demand design formula reduced copper pipe material by 69%; in the present study, total material weight was adopted to serve as a proxy for cost and embodied carbon because these metrics a susceptible to changes over time. Simulations demonstrated improved pump energy consumption between 28% and 46% depending on the system requirements and halved the relative water age in buildings. The traditional systems presented gross oversizing due to the predominant low-flow velocity values, which can negatively impact water quality and system performance. Conversely, the modern systems presented elevated flow velocity profiles and increased pipe frictional losses. Modern systems still performed within specified code performance requirements; however, simulations identified that designers will now need to be more conscious of velocity related phenomena (e.g., noise, erosion-corrosion, and water hammer) that were previously masked by oversized systems. The proposed performance framework serves as a foundational example of how EPS can be applied to quantify the performance of PPS.

Authors

Institutions

Publication Details

Journal
Journal of Water Resources Planning and Management
Published
2025-05-23
DOI
https://doi.org/10.1061/jwrmd5.wreng-6768
Citations
1
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparing the Hydraulic Performance of Cold-Water Premise Plumbing Systems Designed Based on Traditional and Modern Peak Demand Estimates

Brendan M. Josey, Jinzhe Gong
1 citations
Journal of Water Resources Planning and Management
Water Systems and Optimization
0.95
article

Comparing the Hydraulic Performance of Cold-Water Premise Plumbing Systems Designed Based on Traditional and Modern Peak Demand Estimates

Brendan M. Josey, Jinzhe Gong
article en
1 citations

Abstract

Recent research has developed more accurate methods to estimate the peak demand for premise plumbing design in residential buildings. The improved accuracy produces lower design flow rates, leading to a reduction in pipe diameter, the size of pumps and control devices, and so on. Several industry case studies have presented the benefits of a reduced system size from cost, construction, embodied carbon, and energy consumption perspectives. However, little research has been done to (1) consider the wide array of demand scenarios (in addition to the peak demand) of premise plumbing systems (PPS), and (2) identify any potential risks aligned with improved peak demand estimation. To address the gap, the current study proposed a performance framework and used it to quantify and compare the performance (construction, hydraulics, energy consumption, and water quality) of PPS sized by a selected traditional and modern peak demand methods. Extended-period simulation (EPS) over a 24-h period at 1-s time steps is supported by a stochastic water demand model to enable the analysis of these PPS under a wide array of demand scenarios. For the PPS considered, the adoption of the modern peak demand design formula reduced copper pipe material by 69%; in the present study, total material weight was adopted to serve as a proxy for cost and embodied carbon because these metrics a susceptible to changes over time. Simulations demonstrated improved pump energy consumption between 28% and 46% depending on the system requirements and halved the relative water age in buildings. The traditional systems presented gross oversizing due to the predominant low-flow velocity values, which can negatively impact water quality and system performance. Conversely, the modern systems presented elevated flow velocity profiles and increased pipe frictional losses. Modern systems still performed within specified code performance requirements; however, simulations identified that designers will now need to be more conscious of velocity related phenomena (e.g., noise, erosion-corrosion, and water hammer) that were previously masked by oversized systems. The proposed performance framework serves as a foundational example of how EPS can be applied to quantify the performance of PPS.

Journal of Water Resources Planning and ManagementVol. 151(8)
Deakin University (AU)
Openalex Percentile: Top 26%
Water Systems and Optimization
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.