Optimising PVI workflow with lean six sigma: enhancing efficiency and patient care in complex EP labs

Abstract Background Pulmonary vein isolation (PVI) via radiofrequency ablation is a complex procedure for treating atrial fibrillation (AF) that requires advanced equipment and specialised personnel. Optimising workflow in the electrophysiology (EP) lab is critical for efficiency and optimal clinical outcomes. Preparation, execution, and turnover times can significantly increase daily procedure capacity . Lean Six Sigma (L6S), originally from manufacturing, has proven effective in healthcare by reducing inefficiencies, optimising resources, and enhancing process consistency in complex settings like the EP lab. Purpose This study aims to identify and streamline both inter- and intra-procedural processes to optimise patient care, reduce procedure times, and increase hospital capacity for managing AF cases. Methods We analysed 353 PVI only procedures. Using Lean Six Sigma tools, we evaluated inter-procedural times, including patient arrival, room setup, and post-procedure cleaning, along with intra-procedural intervals. By categorising procedural times based on patient profiles and procedural complexity, we sought to identify improvement areas and standardise process times. Results Inter-procedural analysis revealed that the average time between patients (from one patient exiting to the next entering the operating room) was 41±23 minutes, with interquartile values [24, 40, 56]. The mean waiting time from patient arrival at the pre-op room to operating room entry was 10±10 minutes [4, 8, 13]. Other inter-procedural intervals included time from procedure end to patient exit (19±8 minutes [14, 17, 22]), the interval from patient entry to interventionist arrival (18±10 minutes [10, 15, 22]), cleaning team arrival time after patient exit (8±8 minutes [1, 5, 10]), and the cleaning duration itself (7±4 minutes [5, 7, 8]). (Table 1) Intra-procedural time analysis showed an average time of 14±10 minutes [7, 11, 19] from interventionist arrival to femoral puncture. The time from femoral puncture to transseptal puncture averaged 17±10 minutes [12, 15, 21], and the time from transseptal puncture to procedure end was 58±23 minutes [43, 54, 68]. The total procedure time (from femoral puncture to completion) was 74±24 minutes [60, 70, 85]. These findings indicate notable variability across both inter- and intra-procedural phases, suggesting opportunities for standardisation and process improvement. (Figure 1) Conclusion Our initial data collection and analysis highlight substantial variation in both inter- and intra-procedural times during PVI procedures. Applying Lean Six Sigma methodology provides a structured approach to identifying bottlenecks and standardising processes. These insights establish a foundation for further optimisation, potentially increasing daily procedural throughput and improving overall patient care in the EP labTable 1 Figure 1

Authors

Institutions

Publication Details

Journal
EP Europace
Published
2025-05-01
DOI
https://doi.org/10.1093/europace/euaf085.839
Primary Topic
Quality and Safety in Healthcare
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimising PVI workflow with lean six sigma: enhancing efficiency and patient care in complex EP labs

Etelvino Silva, Juan Fernández‐Armenta, Alberto Sánchez Alzola, Andrés Pastor Fernández
EP Europace
Quality and Safety in Healthcare
article

Optimising PVI workflow with lean six sigma: enhancing efficiency and patient care in complex EP labs

Etelvino Silva, Juan Fernández‐Armenta, Alberto Sánchez Alzola, Andrés Pastor Fernández
article en

Abstract

Abstract Background Pulmonary vein isolation (PVI) via radiofrequency ablation is a complex procedure for treating atrial fibrillation (AF) that requires advanced equipment and specialised personnel. Optimising workflow in the electrophysiology (EP) lab is critical for efficiency and optimal clinical outcomes. Preparation, execution, and turnover times can significantly increase daily procedure capacity . Lean Six Sigma (L6S), originally from manufacturing, has proven effective in healthcare by reducing inefficiencies, optimising resources, and enhancing process consistency in complex settings like the EP lab. Purpose This study aims to identify and streamline both inter- and intra-procedural processes to optimise patient care, reduce procedure times, and increase hospital capacity for managing AF cases. Methods We analysed 353 PVI only procedures. Using Lean Six Sigma tools, we evaluated inter-procedural times, including patient arrival, room setup, and post-procedure cleaning, along with intra-procedural intervals. By categorising procedural times based on patient profiles and procedural complexity, we sought to identify improvement areas and standardise process times. Results Inter-procedural analysis revealed that the average time between patients (from one patient exiting to the next entering the operating room) was 41±23 minutes, with interquartile values [24, 40, 56]. The mean waiting time from patient arrival at the pre-op room to operating room entry was 10±10 minutes [4, 8, 13]. Other inter-procedural intervals included time from procedure end to patient exit (19±8 minutes [14, 17, 22]), the interval from patient entry to interventionist arrival (18±10 minutes [10, 15, 22]), cleaning team arrival time after patient exit (8±8 minutes [1, 5, 10]), and the cleaning duration itself (7±4 minutes [5, 7, 8]). (Table 1) Intra-procedural time analysis showed an average time of 14±10 minutes [7, 11, 19] from interventionist arrival to femoral puncture. The time from femoral puncture to transseptal puncture averaged 17±10 minutes [12, 15, 21], and the time from transseptal puncture to procedure end was 58±23 minutes [43, 54, 68]. The total procedure time (from femoral puncture to completion) was 74±24 minutes [60, 70, 85]. These findings indicate notable variability across both inter- and intra-procedural phases, suggesting opportunities for standardisation and process improvement. (Figure 1) Conclusion Our initial data collection and analysis highlight substantial variation in both inter- and intra-procedural times during PVI procedures. Applying Lean Six Sigma methodology provides a structured approach to identifying bottlenecks and standardising processes. These insights establish a foundation for further optimisation, potentially increasing daily procedural throughput and improving overall patient care in the EP labTable 1 Figure 1

EP EuropaceVol. 27(Supplement_1)
Universidad de Cádiz (ES), Hospital Universitario Puerta del Mar (ES)
Openalex Percentile: Top 78%
Quality and Safety in Healthcare
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.