Developing Risk Mitigation Model in Renewable Power Projects: A PLS-SEM Approach

High investment, long-term ventures, and involvement of multidisciplinary interactions make renewable power projects unique propositions regarding risks and their management. However, risk issues and mitigation measures concerning the enterprises’ sustainability and the precise analysis of their underlying structure and influences in the context of renewable resources were seldom reported. The present study fills this gap by identifying 34 risk issues and 13 mitigation strategies from enterprises’ annual reports, literature, and expert discussions. A total of 101 responses were collected using a questionnaire survey and analyzed through exploratory factor analysis (EFA). It resulted in 8 risks and 3 mitigation factors. A hypothesized model was developed and tested using partial least square structural equation modeling (PLS-SEM). The analysis revealed the mitigation measures’ positive and strong influence in controlling risk issues. The measures identified are policy framework, proactive planning and process development; digitization, standardization, and creating databases; and improved stakeholder interaction and liaison. This study adds value to the existing body of knowledge by exploring the mitigation measures, their underlying structure, and their precise influence in containing the risk impacts toward renewable energy sectors’ sustainable development through empirical evidence. The risk professionals and enterprises can adopt the results to modify/adopt appropriate approaches to address risk issues and enhance sustainability.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-05-22
DOI
https://doi.org/10.1061/jladah.ladr-1292
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Developing Risk Mitigation Model in Renewable Power Projects: A PLS-SEM Approach

Kumar Neeraj Jha, Santu Kar, Padam Narayan
1 citations
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
2.11
article

Developing Risk Mitigation Model in Renewable Power Projects: A PLS-SEM Approach

Kumar Neeraj Jha, Santu Kar, Padam Narayan
article en
1 citations

Abstract

High investment, long-term ventures, and involvement of multidisciplinary interactions make renewable power projects unique propositions regarding risks and their management. However, risk issues and mitigation measures concerning the enterprises’ sustainability and the precise analysis of their underlying structure and influences in the context of renewable resources were seldom reported. The present study fills this gap by identifying 34 risk issues and 13 mitigation strategies from enterprises’ annual reports, literature, and expert discussions. A total of 101 responses were collected using a questionnaire survey and analyzed through exploratory factor analysis (EFA). It resulted in 8 risks and 3 mitigation factors. A hypothesized model was developed and tested using partial least square structural equation modeling (PLS-SEM). The analysis revealed the mitigation measures’ positive and strong influence in controlling risk issues. The measures identified are policy framework, proactive planning and process development; digitization, standardization, and creating databases; and improved stakeholder interaction and liaison. This study adds value to the existing body of knowledge by exploring the mitigation measures, their underlying structure, and their precise influence in containing the risk impacts toward renewable energy sectors’ sustainable development through empirical evidence. The risk professionals and enterprises can adopt the results to modify/adopt appropriate approaches to address risk issues and enhance sustainability.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 17(3)
Indian Institute of Technology Guwahati (IN), Indian Institute of Technology Delhi (IN)
Openalex Percentile: Top 14%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Developing Risk Mitigation Model in Renewable Power Projects: A PLS-SEM Approach — Kumar Neeraj Jha, Santu Kar, et al. · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2025) | TGRS Research Map | TGRS