Probabilistic Cash Flow Analysis Considering Risk Impacts by Integrating 5D-Building Information Modeling and Bayesian Belief Network

Unrealistic cash flow forecasts negatively affect project stakeholders and are a common issue for construction practitioners. This study proposes a new method for predicting the probabilistic cash flow of a project that can automate the calculation process while considering the impact of risks and their inter-related structure. This research integrates a Bayesian Belief Network (BBN) and 5D-BIM to provide a new probabilistic cash flow analysis approach. Here, 5D-BIM is used to facilitate cash flow calculations and automate the process. The BBN has also been implemented to assess the impact of risk factors on project cash flow, considering their complex inter-related structure. In addition, a hybrid approach combining fuzzy set theory, decision-making trial and evaluation laboratory (DEMATEL), and interpretive structural modeling (ISM) is used to form the BBN. The proposed method provides a robust tool for calculating the probabilistic cash flow of the project. The results showed that the project’s cash flow in the last month was IRR 14.4 billion without considering the impact of risks. The probabilistic cash flow of the project indicates that due to the impact of the risks, the project cash flow will be in the range of IRR −142.2 billion and IRR 1.11 billion at the end of the project. This shows the possibility of experiencing between 11 and 130% deviation in the project cash flow due to existing risks. In conclusion, project cash flow is unreliable without considering the impact of risks. This framework supports better financial decisions and allows for the evaluation of cash flow risk management scenarios.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-05-22
DOI
https://doi.org/10.3390/buildings15111774
Citations
1
Primary Topic
Technology and Data Analysis
Type
article
Field-Weighted Citation Impact
3.25
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Probabilistic Cash Flow Analysis Considering Risk Impacts by Integrating 5D-Building Information Modeling and Bayesian Belief Network

Farnad Nasirzadeh, Ali Akbar Shirzadi Javid, Mohammadsoroush Tafazzoli, Mohammad Hosein Madihi
1 citations
Buildings
Technology and Data Analysis
3.25
article

Probabilistic Cash Flow Analysis Considering Risk Impacts by Integrating 5D-Building Information Modeling and Bayesian Belief Network

Farnad Nasirzadeh, Ali Akbar Shirzadi Javid, Mohammadsoroush Tafazzoli, Mohammad Hosein Madihi
article en
1 citations

Abstract

Unrealistic cash flow forecasts negatively affect project stakeholders and are a common issue for construction practitioners. This study proposes a new method for predicting the probabilistic cash flow of a project that can automate the calculation process while considering the impact of risks and their inter-related structure. This research integrates a Bayesian Belief Network (BBN) and 5D-BIM to provide a new probabilistic cash flow analysis approach. Here, 5D-BIM is used to facilitate cash flow calculations and automate the process. The BBN has also been implemented to assess the impact of risk factors on project cash flow, considering their complex inter-related structure. In addition, a hybrid approach combining fuzzy set theory, decision-making trial and evaluation laboratory (DEMATEL), and interpretive structural modeling (ISM) is used to form the BBN. The proposed method provides a robust tool for calculating the probabilistic cash flow of the project. The results showed that the project’s cash flow in the last month was IRR 14.4 billion without considering the impact of risks. The probabilistic cash flow of the project indicates that due to the impact of the risks, the project cash flow will be in the range of IRR −142.2 billion and IRR 1.11 billion at the end of the project. This shows the possibility of experiencing between 11 and 130% deviation in the project cash flow due to existing risks. In conclusion, project cash flow is unreliable without considering the impact of risks. This framework supports better financial decisions and allows for the evaluation of cash flow risk management scenarios.

BuildingsVol. 15(11)
Deakin University (AU), Georgia Southern University (US), Iran University of Science and Technology (IR)
Openalex Percentile: Top 9%
Technology and Data Analysis
3.25
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.