Relationship Between Schedule Delay Factors and Project Performance in Civil Engineering Works

A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays.

Authors

Institutions

Publication Details

Journal
Built Environment Journal
Published
2025-05-01
DOI
https://doi.org/10.24191/bej.v21isi.2424
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Relationship Between Schedule Delay Factors and Project Performance in Civil Engineering Works

Zulkiflee Abdul-Samad, Mohd Azrai Azman, Nurul Mahirah Sharuddin, Rodziana Mohd Rodzi
Built Environment Journal
Construction Project Management and Performance
article

Relationship Between Schedule Delay Factors and Project Performance in Civil Engineering Works

Zulkiflee Abdul-Samad, Mohd Azrai Azman, Nurul Mahirah Sharuddin, Rodziana Mohd Rodzi
article en

Abstract

A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays.

Built Environment JournalVol. 21(SI)
University of Malaya (MY), Lambda Instruments (United States) (US), Universiti Teknologi MARA System (MY)
Openalex Percentile: Top 87%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.