IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI

The implementation of a construction project is highly dependent on the availability of labor which is the main driving force in the planning stage until the realization of the project. Without labor, it is impossible to achieve the goals of the project itself. The workability of the workforce is usually called productivity. One thing closely related to labor productivity is the cost of project implementation. The higher the productivity, the smaller the possibility of excess/inflation of project implementation costs, and vice versa. Based on this, further research is needed to determine the factors influencing labor productivity in implementing small-scale construction projects in Bali. Problem-solving and data analysis in this study used the Analytical Hierarchy Process (AHP) method. The results of the study showed that the most influential factors in labor productivity in project implementation were labor skills in carrying out work in the field (14.5%), equipment used during work (12.8%), the physical condition of workers (11.4%), job and work instructions given by superiors (11.3%), time schedule or work implementation time (10.5%), coordination between workers (10.2%), worker discipline during work or project implementation (10.1%), available materials (9.9%), and the last was the workspace or space available in carrying a job (9.4%).

Authors

Institutions

Publication Details

Journal
Publikasi Riset Orientasi Teknik Sipil (Proteksi)
Published
2024-12-31
DOI
https://doi.org/10.26740/proteksi.v6n2.p171-176
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI

Nurul Kusuma Dewi, I Wayan Jawat, I Gusti Agung Gede Nodya Dharmastika, Vinantya Laksmi Ida Ayu Cri et al.
Publikasi Riset Orientasi Teknik Sipil (Proteksi)
Management and Optimization Techniques
article

IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI

Nurul Kusuma Dewi, I Wayan Jawat, I Gusti Agung Gede Nodya Dharmastika, Vinantya Laksmi Ida Ayu Cri, Komang Pipin Indraswari Berata Putri
article en

Abstract

The implementation of a construction project is highly dependent on the availability of labor which is the main driving force in the planning stage until the realization of the project. Without labor, it is impossible to achieve the goals of the project itself. The workability of the workforce is usually called productivity. One thing closely related to labor productivity is the cost of project implementation. The higher the productivity, the smaller the possibility of excess/inflation of project implementation costs, and vice versa. Based on this, further research is needed to determine the factors influencing labor productivity in implementing small-scale construction projects in Bali. Problem-solving and data analysis in this study used the Analytical Hierarchy Process (AHP) method. The results of the study showed that the most influential factors in labor productivity in project implementation were labor skills in carrying out work in the field (14.5%), equipment used during work (12.8%), the physical condition of workers (11.4%), job and work instructions given by superiors (11.3%), time schedule or work implementation time (10.5%), coordination between workers (10.2%), worker discipline during work or project implementation (10.1%), available materials (9.9%), and the last was the workspace or space available in carrying a job (9.4%).

Publikasi Riset Orientasi Teknik Sipil (Proteksi)Vol. 6(2)
Warmadewa University (ID)
Openalex Percentile: Top 49%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.