Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari

Cost is a factor that influences the success and failure of a project. This is a parameter for the success of a project which can be seen from the completion time and minimum costs but with guaranteed quality in accordance with planning. Calculation of the Cost Budget Plan (RAB) is the total product of the quantity or volume of each work item together with the unit price of the work. Budget Plan The total cost of structural calculations using the steel structure method and the concrete structure method. The budget plan for the steel structure method is IDR 24.348.341.722,. and for structural work using the concrete structure method it is IDR. 29.071.552.971,65. In the DC Kendari alfamidi warehouse work, the steel and concrete structure method resulted in a difference of IDR 4.723.211,249,48. . For work items that have significant comparative costs, namely column work in concrete structure method structural work is IDR 7.616.810.069,95 and the planned cost budget for the steel structure method is IDR 3,805,657,473,58. In the Kendari DC Alfamidi warehouse work, the difference is found to be IDR 3.811.152.596,37 which means that work on concrete structure columns is more expensive than concrete structures

Authors

Institutions

Publication Details

Journal
Sultra Civil Engineering Journal
Published
2025-04-29
DOI
https://doi.org/10.54297/sciej.v6i1.1095
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari

Syamsuddin Syamsuddin, Vickky Anggara Ilham, Sindi Meilani
Sultra Civil Engineering Journal
Geotechnical and construction materials studies
article

Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari

Syamsuddin Syamsuddin, Vickky Anggara Ilham, Sindi Meilani
article en

Abstract

Cost is a factor that influences the success and failure of a project. This is a parameter for the success of a project which can be seen from the completion time and minimum costs but with guaranteed quality in accordance with planning. Calculation of the Cost Budget Plan (RAB) is the total product of the quantity or volume of each work item together with the unit price of the work. Budget Plan The total cost of structural calculations using the steel structure method and the concrete structure method. The budget plan for the steel structure method is IDR 24.348.341.722,. and for structural work using the concrete structure method it is IDR. 29.071.552.971,65. In the DC Kendari alfamidi warehouse work, the steel and concrete structure method resulted in a difference of IDR 4.723.211,249,48. . For work items that have significant comparative costs, namely column work in concrete structure method structural work is IDR 7.616.810.069,95 and the planned cost budget for the steel structure method is IDR 3,805,657,473,58. In the Kendari DC Alfamidi warehouse work, the difference is found to be IDR 3.811.152.596,37 which means that work on concrete structure columns is more expensive than concrete structures

Sultra Civil Engineering JournalVol. 6(1)
Universitas Sulawesi Tenggara (ID)
Openalex Percentile: Top 88%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.