Solving multi-objective green flexible job-shop scheduling problem considering operation sequence flexibility

The traditional flexible job-shop scheduling problem ([Formula: see text]) typically operates under the assumption that the product operations must follow a strict sequence, meaning that an operation can only begin once its preceding operation is finished. Nevertheless, in real-world production environments, it is frequently observed that some operations can be performed without sequence restrictions, thereby providing greater flexibility in the scheduling process. In this study, two solution approaches are proposed to tackle three performance measures (completion time, total cost and total energy consumption) in the green [Formula: see text]. The first solution is a multi-level lexicographical analysis. Three levels were proposed in this approach to handle the three performance measures, where a novel mathematical model was introduced at each level. The priorities of the three performance measures are known and fixed. The second solution approach is a weighted multi-objective fuzzy mathematical model, in which the weights for the performance measures are varied. The results illustrate the ability of the second-solution approach to dominate the results of the first-solution approach in terms of simultaneously reducing the three performance measures. The two proposed approaches help the decision-maker to deal with the operation sequence constraints in green [Formula: see text] to acquire optimal scheduling considering the priorities of performance measures.

Authors

Institutions

Publication Details

Journal
International Journal of Sustainable Engineering
Published
2025-05-22
DOI
https://doi.org/10.1080/19397038.2025.2507916
Citations
1
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Solving multi-objective green flexible job-shop scheduling problem considering operation sequence flexibility

Najat Almasarwah
1 citations
International Journal of Sustainable Engineering
Scheduling and Optimization Algorithms
1.24
article

Solving multi-objective green flexible job-shop scheduling problem considering operation sequence flexibility

Najat Almasarwah
article en
1 citations

Abstract

The traditional flexible job-shop scheduling problem ([Formula: see text]) typically operates under the assumption that the product operations must follow a strict sequence, meaning that an operation can only begin once its preceding operation is finished. Nevertheless, in real-world production environments, it is frequently observed that some operations can be performed without sequence restrictions, thereby providing greater flexibility in the scheduling process. In this study, two solution approaches are proposed to tackle three performance measures (completion time, total cost and total energy consumption) in the green [Formula: see text]. The first solution is a multi-level lexicographical analysis. Three levels were proposed in this approach to handle the three performance measures, where a novel mathematical model was introduced at each level. The priorities of the three performance measures are known and fixed. The second solution approach is a weighted multi-objective fuzzy mathematical model, in which the weights for the performance measures are varied. The results illustrate the ability of the second-solution approach to dominate the results of the first-solution approach in terms of simultaneously reducing the three performance measures. The two proposed approaches help the decision-maker to deal with the operation sequence constraints in green [Formula: see text] to acquire optimal scheduling considering the priorities of performance measures.

International Journal of Sustainable EngineeringVol. 18(1)
Mutah University (JO)
Decent work and economic growth
Openalex Percentile: Top 19%
Scheduling and Optimization Algorithms
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Solving multi-objective green flexible job-shop scheduling problem considering operation sequence flexibility — Najat Almasarwah · International Journal of Sustainable Engineering (2025) | TGRS Research Map | TGRS