Analysis of The Relationship of Rework and Inventory to Waste in The Ciputra Hospital Surabaya Project

The problem of material waste in construction projects will be difficult to avoid as it goes along with construction waste. One of the unavoidable problems in a construction project is repeating work or reworking. Rework will also affect the emergence of waste. In a series of construction project activities, inventory is always required to anticipate needs in the ongoing construction project process. Without an inventory, a construction project will encounter the risk that one day it will not be able to meet its needs. This research aimed to determine the correlation between rework and inventory to waste at the Ciputra Hospital Surabaya construction project. It employed a quantitative method by collecting data through a questionnaire distributed to 30 respondents in the project environment. Data analysis involved multiple linear regression analyzes and the SPSS 25 software program. The results of the t-test showed that rework partially had a positive effect on waste with a t-count value of 8.528, while inventory also had a positive effect on waste with a t-count value of 8.661. Simultaneous test results indicated that rework and inventory had a significant effect on waste, with an F-count value of 37.442. Keywords: Waste; Rework; Inventory

Authors

Institutions

Publication Details

Journal
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Published
2024-09-12
DOI
https://doi.org/10.25139/jprs.v7i2.7998
Primary Topic
Healthcare and Environmental Waste Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of The Relationship of Rework and Inventory to Waste in The Ciputra Hospital Surabaya Project

Siti Choiriyah, Felicia Tria Nuciferani, Mukharom Dwi Anggara, Devi I Permatasari
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Healthcare and Environmental Waste Management
article

Analysis of The Relationship of Rework and Inventory to Waste in The Ciputra Hospital Surabaya Project

Siti Choiriyah, Felicia Tria Nuciferani, Mukharom Dwi Anggara, Devi I Permatasari
article en

Abstract

The problem of material waste in construction projects will be difficult to avoid as it goes along with construction waste. One of the unavoidable problems in a construction project is repeating work or reworking. Rework will also affect the emergence of waste. In a series of construction project activities, inventory is always required to anticipate needs in the ongoing construction project process. Without an inventory, a construction project will encounter the risk that one day it will not be able to meet its needs. This research aimed to determine the correlation between rework and inventory to waste at the Ciputra Hospital Surabaya construction project. It employed a quantitative method by collecting data through a questionnaire distributed to 30 respondents in the project environment. Data analysis involved multiple linear regression analyzes and the SPSS 25 software program. The results of the t-test showed that rework partially had a positive effect on waste with a t-count value of 8.528, while inventory also had a positive effect on waste with a t-count value of 8.661. Simultaneous test results indicated that rework and inventory had a significant effect on waste, with an F-count value of 37.442. Keywords: Waste; Rework; Inventory

Ge-STRAM Jurnal Perencanaan dan Rekayasa SipilVol. 7(2)
Institut Teknologi Adhi Tama Surabaya (ID)
Openalex Percentile: Top 59%
Healthcare and Environmental Waste Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.