Analisa Pengendalian Waktu Proyek Dengan Menggunakan Metode Lob (Line Of Balance) Pada Proyek Perumahan Citragarden Sidoarjo

Every construction project inevitably involves project execution, including managing project completion timelines. Time management is crucial for any construction project, particularly when it comes to cost details that significantly impact project success. In specific projects, such as residential homes, shophouses, condominiums, and other repetitive projects, completion times are often inefficient. The Line of Balance (LoB) method is a technique used to determine the duration required to complete a construction project. The Line of Balance (LoB) method, also known as the balance line method, is highly effective for projects involving numerous repetitions, such as highways, housing developments, and similar buildings. This thesis utilizes the CitraGarden Sidoarjo accommodation project as a case study. The Existing Schedule method estimates a completion time of 53 weeks for a single house, whereas the project time for four houses totals 212 weeks, as illustrated by the S-curve project data. In contrast, for two pairs or four houses, the Line of Balance (LoB) method requires 113 weeks to complete the project. Thus, the Line of Balance (LoB) method accelerates the calculation of project completion time for the CitraGarden Sidoarjo housing project.

Authors

Institutions

Publication Details

Journal
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Published
2025-05-20
DOI
https://doi.org/10.25139/jprs.v8i1.8828
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisa Pengendalian Waktu Proyek Dengan Menggunakan Metode Lob (Line Of Balance) Pada Proyek Perumahan Citragarden Sidoarjo

Julistyana Tistogondo, Diah Ayu Restuti Wulandari, Daniel Aristarcus Septianto
Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil
Management and Optimization Techniques
article

Analisa Pengendalian Waktu Proyek Dengan Menggunakan Metode Lob (Line Of Balance) Pada Proyek Perumahan Citragarden Sidoarjo

Julistyana Tistogondo, Diah Ayu Restuti Wulandari, Daniel Aristarcus Septianto
article en

Abstract

Every construction project inevitably involves project execution, including managing project completion timelines. Time management is crucial for any construction project, particularly when it comes to cost details that significantly impact project success. In specific projects, such as residential homes, shophouses, condominiums, and other repetitive projects, completion times are often inefficient. The Line of Balance (LoB) method is a technique used to determine the duration required to complete a construction project. The Line of Balance (LoB) method, also known as the balance line method, is highly effective for projects involving numerous repetitions, such as highways, housing developments, and similar buildings. This thesis utilizes the CitraGarden Sidoarjo accommodation project as a case study. The Existing Schedule method estimates a completion time of 53 weeks for a single house, whereas the project time for four houses totals 212 weeks, as illustrated by the S-curve project data. In contrast, for two pairs or four houses, the Line of Balance (LoB) method requires 113 weeks to complete the project. Thus, the Line of Balance (LoB) method accelerates the calculation of project completion time for the CitraGarden Sidoarjo housing project.

Ge-STRAM Jurnal Perencanaan dan Rekayasa SipilVol. 8(1)
Universitas Jember (ID), Universitas Narotama (ID)
Openalex Percentile: Top 84%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.