Use of Multi-Zones Smart Completions for Reservoir Management in an Extremely Complex Carbonate Reservoir Offshore Qatar
Summary This paper describes the evolution of well completion applied in Reservoir-C in Al Shaheen field and the main issues faced from a reservoir management perspective. Subsequently, details given on the recent advanced completion trial where two (2) different technologies were deployed ( Figure 1 ), passive control completion with Inflow Control Devices (ICD’s) and active control completions with multi-position downhole Inflow Control Valves (ICV’s), and how their usage impacted optimizing production.
Authors
- M. Talib
- Boualem Marir
- Asadullah Memon (ORCID: https://orcid.org/0000-0002-6086-7138)
- R. Brahmantio
- N. Abdelsamea
- A.P. Djumriadi
Institutions
- North Oil Company (Qatar) (QA)
Publication Details
- Published
- 2025-01-01
- DOI
- https://doi.org/10.3997/2214-4609.2025638098
- Primary Topic
- Reservoir Engineering and Simulation Methods
- Type
- article
- Field-Weighted Citation Impact
- 0.00