Optimization of Electric Multiple Unit Headway

The needs of the people of JABODETABEK, Indonesia, for fast, safe, and comfortable means of transportation, such as electric rail trains, are increasing. In 2023, the narrowing of the headway on the East Bekasi-Cikarang station route will cause frequent tripping of the traction substation. This is due to the increasing frequency of multiple electric unit trips and the lack of power capacity at the traction substations to supply electrical power. In addition to that, there is a voltage drop in the overhead power network because the distance between the traction substations is too long. The fastest headway is 3 minutes from the original 13 minutes. This research aims to optimize the power capacity of the traction substation in the LAA 1.10 Cikarang area. The method is load flow analysis using ETAP 19.0.1 software. Results of the design for adding the Tambun Insertion substation and the Telaga Murni Insertion substation. On a 3-minute headway, the average voltage drop increased by 22.5% on the East Bekasi - Cibitung route from 1,222 VDC to 1,497 VDC. Meanwhile, the Cibitung-Cikarang route, originally 1,282 VDC, became 1,494 VDC, or an increase of 16.5%.

Authors

Institutions

Publication Details

Journal
JURNAL INFOTEL
Published
2025-05-15
DOI
https://doi.org/10.20895/infotel.v17i1.1230
Citations
1
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Electric Multiple Unit Headway

Ruliyanta Ruliyanta, Adhyartha Keraf, Fahmi Idris
1 citations
JURNAL INFOTEL
Electric Power Systems and Control
0.73
article

Optimization of Electric Multiple Unit Headway

Ruliyanta Ruliyanta, Adhyartha Keraf, Fahmi Idris
article en
1 citations

Abstract

The needs of the people of JABODETABEK, Indonesia, for fast, safe, and comfortable means of transportation, such as electric rail trains, are increasing. In 2023, the narrowing of the headway on the East Bekasi-Cikarang station route will cause frequent tripping of the traction substation. This is due to the increasing frequency of multiple electric unit trips and the lack of power capacity at the traction substations to supply electrical power. In addition to that, there is a voltage drop in the overhead power network because the distance between the traction substations is too long. The fastest headway is 3 minutes from the original 13 minutes. This research aims to optimize the power capacity of the traction substation in the LAA 1.10 Cikarang area. The method is load flow analysis using ETAP 19.0.1 software. Results of the design for adding the Tambun Insertion substation and the Telaga Murni Insertion substation. On a 3-minute headway, the average voltage drop increased by 22.5% on the East Bekasi - Cibitung route from 1,222 VDC to 1,497 VDC. Meanwhile, the Cibitung-Cikarang route, originally 1,282 VDC, became 1,494 VDC, or an increase of 16.5%.

JURNAL INFOTELVol. 17(1)
Nasional University (ID)
Openalex Percentile: Top 28%
Electric Power Systems and Control
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.