ANALYSIS OF CONTROL BEHAVIOUR OF ARCH ON THROUGH ARCH BRIDGE CONSTRUCTION

Bridges are structures that need to be well-planned to function optimally. Bridges come in various shapes and sizes, one of them is an arch bridge. Through this thesis preparation the author tried to plan the upper structure of a bridge with an arch type on Tukad Ayung Bridge. The initial planning data includes a length of the existing bridge of 64 m and a width of 15 m. The planning method using LRFD and SAP2000 for the software. The arch rib dimensions in the planning of the through arch steel bridge on Tukad Ayung is 900.600.30.40 box profile with a cross-sectional height. It is using steel material of special type of structural steel for bridges with ASTM A 709 grade 50 specifications. From the analysis result, the stress melting point is fy= 345 MPa and the modulus of elasticity steel is E= 200000 MPa. The cross-sectional height is 900 mm, cross-sectional width is 600 mm, the body thickness (tw) is 30 mm and the wing thickness (tf) is 40 mm.

Authors

Institutions

Publication Details

Journal
Journal of Infrastructure Planning and Engineering (JIPE)
Published
2024-12-31
DOI
https://doi.org/10.22225/jipe.3.2.2024.35-40
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALYSIS OF CONTROL BEHAVIOUR OF ARCH ON THROUGH ARCH BRIDGE CONSTRUCTION

Cok Agung Yujana, Thanh Duc Dang, I Gede Dhana Putra Sanjaya, Krisna Putra Wijaya et al.
Journal of Infrastructure Planning and Engineering (JIPE)
Structural Engineering and Vibration Analysis
article

ANALYSIS OF CONTROL BEHAVIOUR OF ARCH ON THROUGH ARCH BRIDGE CONSTRUCTION

Cok Agung Yujana, Thanh Duc Dang, I Gede Dhana Putra Sanjaya, Krisna Putra Wijaya, I Putu Deny Surastika Aditama
article en

Abstract

Bridges are structures that need to be well-planned to function optimally. Bridges come in various shapes and sizes, one of them is an arch bridge. Through this thesis preparation the author tried to plan the upper structure of a bridge with an arch type on Tukad Ayung Bridge. The initial planning data includes a length of the existing bridge of 64 m and a width of 15 m. The planning method using LRFD and SAP2000 for the software. The arch rib dimensions in the planning of the through arch steel bridge on Tukad Ayung is 900.600.30.40 box profile with a cross-sectional height. It is using steel material of special type of structural steel for bridges with ASTM A 709 grade 50 specifications. From the analysis result, the stress melting point is fy= 345 MPa and the modulus of elasticity steel is E= 200000 MPa. The cross-sectional height is 900 mm, cross-sectional width is 600 mm, the body thickness (tw) is 30 mm and the wing thickness (tf) is 40 mm.

Journal of Infrastructure Planning and Engineering (JIPE)Vol. 3(2)
National Central University (TW), Warmadewa University (ID)
Openalex Percentile: Top 67%
Structural Engineering and Vibration Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.