PERFORMANCE ANALYSIS OF THE WARMADEWA EDUCATIONAL HOSPITAL BUILDING CONSTRUCTION PROJECT

In a project, effective management is crucial for organizing workflow and control to achieve the project's objectives. Project management involves continuous monitoring and evaluation of project performance to ensure that all parts of the project are on track. The aim of this study is to analyze the performance of the Warmadewa Educational Hospital Building Construction Project in terms of cost and time using the Earned Value method. The data used consists of primary data obtained from field observations and interviews, as well as secondary data from weekly reports, the Budget Plan (RAB), and the project schedule. The analysis shows that the project experienced delays from the first week up to the evaluation week. The Schedule Variance (SV) and Schedule Performance Index (SPI) analysis indicates that the project is progressing slower than planned. From the Estimate To Complete (ETC) and Estimate At Completion (EAC) analyses, the project is estimated to require an additional 719 days to complete. This represents a delay of 92 days from the initial planned duration of 627 days. The Cost Variance (CV) and Cost Performance Index (CPI) analysis indicate that the project costs are within the budget.

Authors

Institutions

Publication Details

Journal
Journal of Infrastructure Planning and Engineering (JIPE)
Published
2024-12-31
DOI
https://doi.org/10.22225/jipe.3.2.2024.63-68
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERFORMANCE ANALYSIS OF THE WARMADEWA EDUCATIONAL HOSPITAL BUILDING CONSTRUCTION PROJECT

Kadek Windy Candrayana, I Wayan Gde Erick Triswandana, Ni Made Jero Suarmini
Journal of Infrastructure Planning and Engineering (JIPE)
Occupational Health and Safety Research
article

PERFORMANCE ANALYSIS OF THE WARMADEWA EDUCATIONAL HOSPITAL BUILDING CONSTRUCTION PROJECT

Kadek Windy Candrayana, I Wayan Gde Erick Triswandana, Ni Made Jero Suarmini
article en

Abstract

In a project, effective management is crucial for organizing workflow and control to achieve the project's objectives. Project management involves continuous monitoring and evaluation of project performance to ensure that all parts of the project are on track. The aim of this study is to analyze the performance of the Warmadewa Educational Hospital Building Construction Project in terms of cost and time using the Earned Value method. The data used consists of primary data obtained from field observations and interviews, as well as secondary data from weekly reports, the Budget Plan (RAB), and the project schedule. The analysis shows that the project experienced delays from the first week up to the evaluation week. The Schedule Variance (SV) and Schedule Performance Index (SPI) analysis indicates that the project is progressing slower than planned. From the Estimate To Complete (ETC) and Estimate At Completion (EAC) analyses, the project is estimated to require an additional 719 days to complete. This represents a delay of 92 days from the initial planned duration of 627 days. The Cost Variance (CV) and Cost Performance Index (CPI) analysis indicate that the project costs are within the budget.

Journal of Infrastructure Planning and Engineering (JIPE)Vol. 3(2)
Warmadewa University (ID)
Openalex Percentile: Top 58%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.