Multi-Project Staff Scheduling Optimization Considering Employee Welfare in Construction Projects

Multi-project staff scheduling optimization is a critical challenge in engineering management. However, traditional methods often overlook employee welfare, resulting in scheduling solutions that lack a people-centered approach. This study develops a multi-objective model that incorporates employee welfare to balance project performance and staff well-being. A mixed-integer programming model is proposed, integrating task allocation, resource scheduling, income growth, and workload balance as core optimization objectives. An improved Spider Wasp Optimization Algorithm (SWOIM) is employed to solve this model. The experimental results demonstrate that SWOIM outperforms conventional optimization algorithms in convergence speed, stability, and solution quality. It enhances staff scheduling efficiency while ensuring fair compensation and balanced workload distribution. A case study further validates the practical applicability of the proposed approach, showing that the optimized schedule not only improves task allocation but also enhances employee satisfaction and overall organizational performance. This study presents a people-centered scheduling framework aligned with sustainable workforce management principles and offers practical insights for improving multi-project coordination.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-05-18
DOI
https://doi.org/10.3390/buildings15101706
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Project Staff Scheduling Optimization Considering Employee Welfare in Construction Projects

Junlong Peng, Fei Zhou
Buildings
Resource-Constrained Project Scheduling
article

Multi-Project Staff Scheduling Optimization Considering Employee Welfare in Construction Projects

Junlong Peng, Fei Zhou
article en

Abstract

Multi-project staff scheduling optimization is a critical challenge in engineering management. However, traditional methods often overlook employee welfare, resulting in scheduling solutions that lack a people-centered approach. This study develops a multi-objective model that incorporates employee welfare to balance project performance and staff well-being. A mixed-integer programming model is proposed, integrating task allocation, resource scheduling, income growth, and workload balance as core optimization objectives. An improved Spider Wasp Optimization Algorithm (SWOIM) is employed to solve this model. The experimental results demonstrate that SWOIM outperforms conventional optimization algorithms in convergence speed, stability, and solution quality. It enhances staff scheduling efficiency while ensuring fair compensation and balanced workload distribution. A case study further validates the practical applicability of the proposed approach, showing that the optimized schedule not only improves task allocation but also enhances employee satisfaction and overall organizational performance. This study presents a people-centered scheduling framework aligned with sustainable workforce management principles and offers practical insights for improving multi-project coordination.

BuildingsVol. 15(10)
Changsha University of Science and Technology (CN)
Natural Science Foundation of Hunan Province
Decent work and economic growth
Openalex Percentile: Top 88%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.