Reinforcement Learning–Based Multiobjective and Multiconstraint Production Scheduling for Precast Concrete

Optimizing the production scheduling for precast concrete can significantly reduce lead times and enhance delivery efficiency. The performance of traditional scheduling models for precast concrete can be enhanced due to the unique characteristics of the concrete during production. However, the efficiency of these models decreases as problem complexity and uncertainty increase. This study introduces practical considerations, such as a limited number of molds, buffers, uncertainty of order arrivals, and vehicles. Furthermore, a multiobjective optimization scheduling model is developed to address the requirements of modern industrial development, by considering the on-time delivery rate, total processing time, and workstation utilization rate. A reinforcement learning algorithm-based solution is devised and validated through real-world case studies. This methodology effectively addresses the challenges of production scheduling for precast concrete in a multiconstraint, multiobjective real-world scenario with uncertain order arrival times. By adopting this approach, small and medium-sized precast manufacturers can enhance their responsiveness to unpredictable scheduling issues, thereby significantly improving the efficiency of precast concrete production.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-05-19
DOI
https://doi.org/10.1061/jcemd4.coeng-15995
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reinforcement Learning–Based Multiobjective and Multiconstraint Production Scheduling for Precast Concrete

Wenzhu Liao, Leting Zu
1 citations
Journal of Construction Engineering and Management
BIM and Construction Integration
1.01
article

Reinforcement Learning–Based Multiobjective and Multiconstraint Production Scheduling for Precast Concrete

Wenzhu Liao, Leting Zu
article en
1 citations

Abstract

Optimizing the production scheduling for precast concrete can significantly reduce lead times and enhance delivery efficiency. The performance of traditional scheduling models for precast concrete can be enhanced due to the unique characteristics of the concrete during production. However, the efficiency of these models decreases as problem complexity and uncertainty increase. This study introduces practical considerations, such as a limited number of molds, buffers, uncertainty of order arrivals, and vehicles. Furthermore, a multiobjective optimization scheduling model is developed to address the requirements of modern industrial development, by considering the on-time delivery rate, total processing time, and workstation utilization rate. A reinforcement learning algorithm-based solution is devised and validated through real-world case studies. This methodology effectively addresses the challenges of production scheduling for precast concrete in a multiconstraint, multiobjective real-world scenario with uncertain order arrival times. By adopting this approach, small and medium-sized precast manufacturers can enhance their responsiveness to unpredictable scheduling issues, thereby significantly improving the efficiency of precast concrete production.

Journal of Construction Engineering and ManagementVol. 151(8)
Chongqing University (CN)
Openalex Percentile: Top 25%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.