A Study on Cost Management for Power Grid Project Based on 3D Design Achievement

Based on a survey of the characteristics of the Power Grid Project and the current situation of cost management, the objectives and functional requirements of the management platform were analyzed, and a research framework for achieving the Power Grid Project cost management platform was established. A digital, information-based solution was implemented in conjunction with the 3D design achievement. In substation construction, the application of 3D design technology will provide a comprehensive digital solution for project cost management, improve the efficiency of design and construction, reduce costs and risks, and optimize operation and maintenance processes. At the same time, 3D design can also achieve a seamless connection between design and construction, reducing errors and delays in information transfer.

Authors

Institutions

Publication Details

Published
2024-12-04
DOI
https://doi.org/10.1109/spies63782.2024.10983415
Primary Topic
Technology and Data Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study on Cost Management for Power Grid Project Based on 3D Design Achievement

S.Y.T. Lang, Yiting Li
Technology and Data Analysis
article

A Study on Cost Management for Power Grid Project Based on 3D Design Achievement

S.Y.T. Lang, Yiting Li
article en

Abstract

Based on a survey of the characteristics of the Power Grid Project and the current situation of cost management, the objectives and functional requirements of the management platform were analyzed, and a research framework for achieving the Power Grid Project cost management platform was established. A digital, information-based solution was implemented in conjunction with the 3D design achievement. In substation construction, the application of 3D design technology will provide a comprehensive digital solution for project cost management, improve the efficiency of design and construction, reduce costs and risks, and optimize operation and maintenance processes. At the same time, 3D design can also achieve a seamless connection between design and construction, reducing errors and delays in information transfer.

Dalian University of Technology (CN)
Openalex Percentile: Top 51%
Technology and Data Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.