Assessing and Prioritizing Construction Contracting Risks with an Extended FMEA Decision-Making Model in Uncertain Environments
This study aims to enhance risk assessment in construction contracting by addressing the limitations of traditional Failure Modes and Effects Analysis (FMEA), particularly its inability to effectively handle uncertainty and prioritize risks with equal Risk Priority Numbers (RPNs). To overcome these issues, a hybrid decision-making framework was developed by integrating fuzzy logic with the Step-wise Weight Assessment Ratio Analysis (SWARA) and Multi-Attributive Border Approximation Area Comparison (MABAC) methods. The proposed model enables more accurate weighting of risk criteria and prioritization of risks under uncertain conditions. A case study involving 18 identified construction contracting risks demonstrated the model’s effectiveness, with key risks such as inadequate technical skills and poor contract conditions ranked highest due to their severe impact on cost and project outcomes. The hybrid approach improved the clarity and consistency of risk prioritization compared to traditional methods. This research contributes a flexible and practical tool for managing risks in complex construction environments. Future studies are encouraged to explore integration with real-time project monitoring systems and the application of this model across different infrastructure domains.
Authors
- Maryam Mohammadi (ORCID: https://orcid.org/0000-0002-2654-719X)
- Sara Sarvi
- Saied Jafarzadeh Ghoushchi
Institutions
- Urmia University of Technology (IR)
- University of Malaya (MY)
Publication Details
- Journal
- Spectrum of Decision Making and Applications.
- Published
- 2025-05-19
- DOI
- https://doi.org/10.31181/sdmap31202642
- Citations
- 6
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 12.64